Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Special notice, total small business set-aside

36C24726Q0802 Amendment 0001

36C24726Q0802_1

Department of Veterans Affairs, 247-Network Contract Office 7. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

September 8, 2026 at 12:00 PM EDT

Closed 54 days ago. Posted September 2, 2026. Scheduled to archive September 23, 2026.

Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities

This one closed 54 days ago

38 like it are open now in electrical contractors and other wiring installation contractors

All 38 open in electrical contractors and other wiring installation contractors

Description

As published on SAM.gov.

Questions and Answers

The purpose of this amendment is provide answers to the additional questions received after the question period. The due date for offers is extended until September 08, 2026, at 12:00PM EST.

**Offerors must acknowledge receipt of Amendment 0001 with their offers**

Q1: Does the soundboard need to be analog or digital?

A1: Digital

Q2: If digital, how many faders are required?

A2: 24 faders

Q3: How many watts per channel on the Crown amplifiers?

A3: 650W @ 8 Ohms

Q4: How many channels per amplifier?

A4: 2

Q5: How many HDMI outputs on the HDMI Splitter?

A5: 4

Q6: The Description of Need lists an audio inserter but that is not in the requirements, please specify if an audio inserter is required.

A6: Combining the audio feed from the sound board with the video feed from the camera is a requirement

Q7: The Description of Need lists a digital camera, is the contractor to provide a camera?

A7: Yes

Q8: The Description of Need lists a HDMI switcher but that is not in the requirements, please specify if an HDMI switcher is required and if so how many inputs and outputs.

A8: It is required.  The switcher needs to support a minimum of 4 input channels

Q9: The description of Need lists microphones but none are listed in the requirements, are microphones to be reused or is the contractor to quote microphones?

A9: The existing microphones will be reused

Q10: If microphones are requested to be provided, please specify how many, wired or wireless, and what type of wireless (i.e. handheld, lavalier, or head worn)

A10: Not required

Q11: If so, please specify if it needs to be a Pan-Tilt-Zoom (PTZ) camera or a professional/handheld camera?

A11: PTZ

Q12: If the customer requests a PTZ camera, do they want a control system to control the camera, HDMI switching, and audio from a wireless touch panel?

A12: The camera needs to be controlled with a handheld remote

Q13: If a control system is requested would the customer prefer to control volume from an iPad instead of a physical soundboard?

A13: Control from a physical soundboard

Q14: Is fiber distribution already in place for all rooms that the Fiber Command is to tie into?

A14: No.  Fiber optic cables will need to be installed to each Samsung television.

Q15: If not please specify how many rooms and approximate distances required.

A15: All monitors will be placed in the same room.  Approximate distance is 75.

Q16: Is the snake to be analog or digital?

A16: Analog

Q17: If analog, how long does the snake need to be?

A17: Approximately 25'

Q18: How is the snake to be ran?  (i.e. in conduit, through basement, surface mount, through the ceiling)

A18: Surface mount

Q19: If digital, is there a CAT line already in place for use?

A19: NA

Q20: If cables need ran in the ceiling how high is the ceiling?

A20: 30'

Q21: Is it open rafters?

A21: Yes

Q22: Can we get a lift or scaffolding in to run cables or would a ladder work?

A22: It is an open vaulted ceiling approximately 

Q23: Is the Fractal Audio AXE-FX III to be utilized for a guitar or as a digital signal processor?

A23: It is to be utilized for 2 guitars and a base guitar and needs to be fully configured as part of the project.

Q24: Is the contractor to provide mounts for the TVs or will those also be purchased by the customer?

A24: Mounts should be provided by contractor

Q25: How high are the TVs to be hung and on what type of wall?

A25: One wall is cinder block and the other is sheetrock.

Q26: If the contractor is to provide the TV mounts are they required to be full motion mounts?

A26: Flat mounts are fine.

Q27: Please provide a list of existing equipment that is to be reused.

A27: The only existing equipment to be reused is the 4 existing microphones.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 2, 2026

    Special notice, originally combined synopsis and solicitation

    Due September 8, 2026 at 12:00 PM EDT. SAM.gov, notice aeb93c34cc044c27b93b5b93cc1c8251

    2 revisions on SAM
    • September 2, 2026: publish, special notice
    • August 20, 2026: publish, combined synopsis and solicitation

Points of contact