Award notice, service-disabled veteran-owned small business set-aside, first published as presolicitation

619A4-23-111 | Replace Sewer Lift Pump in Building 12| CAVHC East Campust, Tuskegee, AL

36C24725R0023

Department of Veterans Affairs, 247-Network Contract Office 7. Commercial and Institutional Building Construction.

Awarded

Paramount Construction Group, LLC

$336,187.00 obligated so far on USAspending

Description

As published on SAM.gov with the solicitation of March 7, 2025.

This project will remove and replace the sewage lift pump located on the first floor of Building 12 that was installed around the time the boiler plant was constructed in 1923. The existing pump currently serves buildings 12, 13, 14, 15, and 65. Although the pump remains operational, if it were to fail replacement parts are not available to repair the pump. This project design specifies new duplex sewer pumps that can be serviced along with a basin. This will help to ensure that sewage service to buildings 12, 13, 14, 15, and 65 continues with no interruptions. The new duplex sewer pumps will be connected to emergency power to provide service in the event of a power outage.

Amendment 0001 - Site Visit Clarification (Site Visit Scheduled for January 29, 2025 at 10:00 am CST).

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
KV1NW9F8M7W6
CAGE
675Y2
Vendor location
Madison, MS
Contract
36C24725C0096, definitive contract
Obligated
$336,187.00
Actions
7 between August 15, 2025 and September 14, 2026
Competition
Full and Open Competition After Exclusion of Sources, 6 offers received
Set-aside reported
Service Disabled Veteran Owned Small Business SET-ASIDE
Described as
Remove and Replace Sewage Lift Pump in Building 12.
Match
award number 36C24725C0096 equals the contract number; same awarding office 36C247 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 26, 2024

    Presolicitation

    619A4-23-111 | Replace Sewer Lift Pump in Building 12

    Due December 19, 2024 at 1:00 PM EST. SAM.gov, notice a41f493e7cf643888e56e0951ed8c265

  2. November 27, 2024

    Presolicitation

    619A4-23-111 | Replace Sewer Lift Pump in Building 12

    Due December 19, 2024 at 1:00 PM EST. SAM.gov, notice 3404b745660047a88133d116740ab0d1

  3. January 22, 2025

    Solicitation

    Replace Sewer Lift Pump in Building 12 | Project No. 619A4-23-111.

    Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice 9e5469b189474f9fa4e0e92f4d340cbb

  4. January 27, 2025

    Solicitation

    Replace Sewer Lift Pump in Building 12 | Project No. 619A4-23-111.

    Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice 516221dd71e4430aaeb41d3851bc45e8

  5. February 4, 2025

    Solicitation

    Replace Sewer Lift Pump in Building 12 | Project No. 619A4-23-111.

    Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice d7191a95ef56497db089df7789c879c2

  6. February 4, 2025

    Solicitation

    Replace Sewer Lift Pump in Building 12 | Project No. 619A4-23-111.

    Due March 10, 2025 at 1:00 PM EDT. SAM.gov, notice e1b9f3a4fb9a46c8b059fa56853e3fa8

  7. March 6, 2025

    Solicitation

    Replace Sewer Lift Pump in Building 12 | Project No. 619A4-23-111.

    Due March 28, 2025 at 1:00 PM EDT. SAM.gov, notice 5cb2841c85924839bcb4b2009a024e39

  8. March 7, 2025

    Solicitation

    Replace Sewer Lift Pump in Building 12 | Project No. 619A4-23-111.

    Due March 28, 2025 at 1:00 PM EDT. SAM.gov, notice 78da19c72cf74b7599da985b0181d1f7

  9. August 15, 2025

    Award notice

    Awarded to Paramount Construction Group, LLC MADISON 39110 MSR for $336,187. SAM.gov, notice e0ae94cf8c124cf1ac119ec063758b78

Points of contact