Solicitation, service-disabled veteran-owned small business set-aside
FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)
36C24626B0041_1
Department of Veterans Affairs, 246-Network Contracting Office 6. Commercial and Institutional Building Construction.
Offers due
December 2, 2026 at 9:00 AM EST
31 days from now. Posted October 23, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- MEDTRONIC INFINITY THORACIC TRAYSources soughtNAICS 339113Anywhere in the US36C24626Q1101Closes todayNov 1
- Closes tomorrowNov 2
- Generator Inspection Service and Routine Maintenance -SolicitationSDVOSBNAICS 238210Virginia36C24627Q0090Closes tomorrowNov 2
Similar, open now
- PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT
Department of the Army, W074 Endist Wilmington
SolicitationNAICS 236220North CarolinaW912PM279A001Closes in 10 daysNov 11 - P-271, E-130J Main Operating and Training Base, MCAS Cherry Point, NC
Department of the Navy, Navfacsyscom Mid-Atlantic
Closes in 11 daysNov 12 - RENOVATE WARDS 3 EAST & 3 WEST
Department of Veterans Affairs, 246-Network Contracting Office 6
Sources soughtNAICS 236220Asheville, NC36C24627Q0105Closes in 11 daysNov 12
All 183 open in commercial and institutional building construction
Description
As published on SAM.gov.
Replace Domestic Water, Chilled Water, and Steam Piping
Project Number 558-24-160
STATEMENT OF WORK
Description of Work - Summary:
The piping at the Durham VA Health Care Center, 508 Fulton St, Durham, NC is aging. There is an immediate need to replace the domestic water, chilled water and steam piping.
General:
The contractor shall replace domestic water, chilled water and steam piping (Priority 1) in Building 1 and 23 at the Durham VA Health Care System. The contractor shall provide phasing coordination for each section below to minimize impact of normal operations. The contractor is responsible for providing all supervision, materials, labor, equipment, transportation, testing, and storage for this project. All work shall be performed according to the attached drawings and specifications.
The VA will accept the Superintendent shall perform the roles and responsibilities of Superintendent and Quality Control—dual hat. Safety officer must remain separate.
Place of Performance: Tasks will be performed at the VA Medical Center Durham, VA. Work will be around an occupied healthcare facility in operation 24 hours a day. This work will require appropriate personal protective equipment and proper infection control measures. Work will be phased to minimize disruption to clinic and medical center operations.
Period of Performance: Completion of project shall be 603 calendar days from NTP. This includes procurement of long lead time items.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 9_558-24-160_Durham Piping_Bid Documents Specs.pdf14.4 MB, October 23, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 23, 2026
Solicitation, originally presolicitation
Due December 2, 2026 at 9:00 AM EST. SAM.gov, notice 5233db81cb1f410aa29b64697ab6cc04
2 revisions on SAM
- October 23, 2026: publish, solicitation
- October 23, 2026: publish, presolicitation
Points of contact
- Alice Custis, Contracting Officeralice.custis@va.gov757.722.9961 ext. 18670