Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

Adaptive Bicycles

36C24525Q0384

Department of Veterans Affairs, 245-Network Contract Office 5. Motorcycle, Bicycle, and Parts Manufacturing.

Response deadline

March 27, 2025 at 4:00 PM EDT

Closed 540 days ago. Posted March 25, 2025, first published March 20, 2025. Scheduled to archive April 6, 2025.

Description

As published on SAM.gov.

AMENDMENT OF SOLICITATION - 36C24525Q0384 This is the correct requirement for the solicitation: Hase Trigo Nexus 8- speed (26201) Qty 1 Hase Trigo 24- Speed (26100) Qty 3 Kettwiesel All Round Nexus (26053) Qty 1 Catrike MAX Qty 1 Hase workbench (25708) Qty 1 Pedal Box (26171) Qty 1 Tandem Coupler Qty 5 Program Box Qty 1 For the Hase Trigo Nexus 8 or the Hase Trigo 24, shifting break controls on both sides. Catrike Max Bike, in the color Purple.

For the Hase Trigo and Kettwiesel, differentials on all bikes as well as upgraded suspensions.

Program Box contents: AWS-10 Fold-Up Hex Wrench Set - 1.5, 2, 2.5, 3, 4, 5, & 6mm CC-3.2 Chain Checker CN-10 Professional Cable and Housing Cutter CT-5 Mini ChainBrute Chain Tool - single-speed & 5-12 speed compatible FR-5.2 Cassette Lockring Tool GSC-1 GearClean Brush HCW-16.3 Chain Whip / Pedal Wrench HR-8 8mm Hex Wrench MLP-1.2 Master Link Pliers SD-2 Phillips Screwdriver SW-7.2 Triple Spoke Wrench TL-1.2 Tire Lever Set TWS-3 3-Way Torx-Compatible Wrench - T10, T25 & T30 Portable Power tire pump Frequently needed replacement parts

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 20, 2025

    Combined synopsis and solicitation

    Due March 27, 2025 at 4:00 PM EDT. SAM.gov, notice 416fe4eb036a46969bac9703bc03286e

  2. March 25, 2025

    Combined synopsis and solicitation

    Due March 27, 2025 at 4:00 PM EDT. SAM.gov, notice f5fa761912ac4febb3007f824c47be03

Points of contact