Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Special notice

FY27 SERVICES (1x) Spill Prevention, Control, and Countermeasure (SPCC) Plan

36C24227P0073

Department of Veterans Affairs, 242-Network Contract Office 02. Environmental Consulting Services.

Awarded

First Environment Inc.

$10,013.16 obligated so far on USAspending

Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities

This one was awarded in 2026

9 like it are open now in environmental consulting services

All 9 open in environmental consulting services

Description

As published on SAM.gov.

The Veterans Health Administration, Network Contracting Office 02 intends to solicit from a single source IAW FAR 13.106(b) to obtain a contract for: It s Five-Year Review, Evaluation, and Update of the Spill Prevention, Control, and Countermeasure (SPCC) Plan for the VA Hudson Valley Health Care System (VAHVHCS) at Castle Point Campus (CPC) and Montrose Campus (MC). The SPCC program is a regulatory framework designed to prevent oil discharges into U.S. navigable waters and adjoining shorelines by requiring facilities to implement prevention, control, and response measures. The VA Hudson Valley Health Care System is mandated by 40 CFR 112.5(b) to review and evaluate its SPCC Plans for Castle Point Campus and Montrose Campus every five years. The last update to the SPCC Plan was completed in 2021. Period of Performance (POP) (estimated): 10/22/2026 through 09/30/2027 with provision of (0) option years. All work to begin immediately upon receipt of a contract. Requirement Description: The Spill Prevention, Control, and Countermeasure (SPCC) Plan must be a written, management-approved document detailing procedures, control measures, and countermeasures to prevent and respond to oil discharges. The core requirement of such plan includes but is not limited to and must follow good engineering practices and comply with 40 CFR Part 112 regulations, or provide equivalent environmental protection if deviations are necessary (40 CFR 112.7, 112.3)  Certification: Plans must be certified by a licensed Professional Engineer (PE) unless the facility qualifies for self-certification under the qualified facility criteria. Certification ensures that the plan meets regulatory and engineering standards (40 CFR 112.3, 112.7)  Plan Content: SPCC Plans must address three main areas: Operating Procedures: Procedures to prevent oil spills during normal facility operations, including handling, storage, and transfer of oil  Control Measures: Physical containment systems such as dikes, berms, retaining walls, curbing, drip pans, sumps, collection systems, drainage systems, weirs, booms, spill diversion ponds, retention ponds, or sorbent materials to prevent oil from reaching navigable waters or shorelines  Countermeasures: Procedures to detect, contain, clean up, and mitigate oil discharges, including manpower, equipment, and materials needed for rapid response  Inspections, Testing, and Records: Facilities must conduct regular inspections and tests of oil storage containers, valves, and piping. Records of inspections, tests, and maintenance must be kept for at least three years. Personnel must be trained in SPCC procedures, discharge prevention, and applicable environmental regulations  Security Measures: The plan must describe how the facility secures oil handling areas, master flow and drain valves, starter controls, and loading/unloading connections to prevent unauthorized access and vandalism. Loading/Unloading Racks: For tank car or tank truck operations, containment systems must hold at least the maximum capacity of a single compartment, and drainage systems must prevent uncontrolled discharges. Amendments and Updates: SPCC Plans must be reviewed and amended as necessary to reflect changes in facility operations, equipment, or regulatory requirements. New facilities must prepare and implement a plan before beginning operations, while existing facilities must maintain and update their plans to ensure compliance.  Proposed Source: FIRST ENVIRONMENT 10 Park Place | bldg. 1A, Suite 504 Butler, NJ 07405 The Contracting Officer (CO) has determined after market research that there does not appear to be another certified SDVOSB that can meet the emergent need of the facility to get the requirement complete to meet the deadline outlined without unacceptable risk. Therefore, the most suitable and responsible course of action is to sole source this requirement to First Environment a certified SDVOSB, to ensure continuity of regulatory compliance, operational reliability, and to meet the facilities need of meeting the requirements of 40 CFR 112.5(b). Place of Performance: VA Hudson Valley Health Care System (VAHVHCS) at: Castle Point Campus (CPC) Montrose Campus (MC) The NAICS code for this requirement is: 541620 Environmental Consulting Services (Size Standard: $19.0 Million). Intended Source: FIRST ENVIRONMENT THIS NOTICE OF INTENT IS NOT A REQUEST FOR COMPETITIVE QUOTES. However, interested parties may identify their interest and capability to respond to this requirement by : Wednesday October 21st 2026 at 16:00 Eastern Standard Time (EST). The Department of Veterans Affairs will NOT be responsible for any costs incurred by interested parties in responding to this notice of intent. Only written responses from responsible sources will be considered. Any prospective contractor must be registered in the System for Award Management (SAM) to be eligible for award. Interested parties are encouraged to furnish information by email only with RESPONSE TO INTENT TO SOLE SOURCE Spill Prevention, Control, and Countermeasure (SPCC) in the subject line. All documents submitted will not be returned. All interested parties shall submit clear and convincing documentation demonstrating their capabilities to satisfy the requirements listed above to Contract Specialist, Jason M. Rundle at jason.rundle@va.gov. The capability documentation should include general information and technical background describing in detail the prospective contractor's capabilities and experience that will demonstrate the ability to support these requirements. Page 1 of Page 2 of 2 Page 1 of

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
FWE5JGSJCBD9
CAGE
1JQG4
Vendor location
Butler, NJ
Contract
36C24227P0073, purchase order
Obligated
$10,013.16
Actions
1 between October 22, 2026 and October 22, 2026
Competition
Not Competed, 1 offer received
Set-aside reported
No Set Aside Used.
Described as
Spill Prevention Planning
Match
solicitation number 36C24227P0073 was reused as the contract number; same awarding office 36C242 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 21, 2026

    Special notice

    Due October 21, 2026 at 4:00 PM EDT. SAM.gov, notice 8d885bc1b36946ed91d44477a1f31d98

    1 revisions on SAM
    • October 21, 2026: publish, special notice

Points of contact