630A4-26-401 MRI AHU Modification
36C24226R0060
Department of Veterans Affairs, 242-Network Contract Office 02. Commercial and Institutional Building Construction.
Response deadline
August 28, 2026 at 12:00 PM EDT
Closed 19 days ago. Posted August 26, 2026, first published June 30, 2026. Scheduled to archive September 27, 2026.
Description
As published on SAM.gov.
36C24226R0060 Amendment 5 630A4-26-401 MRI AHU Modification 8. Question -Hallway Fan Coil Units-The contract documents indicate (6) 18,000 BTU/h chilled water surface-mounted fan coil units in the hallway. We have concerns with this configuration: the surface-mounted units would protrude into the corridor, presenting both an aesthetic issue and a potential head-strike hazard for pedestrians. We propose substituting ceiling-mounted fan coil units in lieu of the surface-mounted units. Please advise which of the following options is acceptable:
VA Response: Option A would be acceptable if there is no additional cost to the VA. Six ceiling mounted units would provide both the desired level of equipment redundancy and distributed air flow equivalent to the contract design wall mounted units. An 18,000 btu wall mounted evaporator fan unit requires a minimum of 6 inches of clearance below the ceiling for proper air flow. As the evaporator fan coil unit is approximately 12-14 inches high, in an 8 foot high corridor (96 inches clear), there would be a minimum of 76 inches clearance under the evaporator fan unit, or 6 foot 3 inches. If the corridor is higher than 8 feet then the clearance would increase.
Option A: Provide (6) ceiling-mounted fan coil units at 18,000 BTU/h each; note that due to ceiling constraints, the units cannot be equally spaced along the corridor.
Option B: Provide (3) ceiling-mounted fan coil units of higher capacity, sized to provide equivalent total cooling capacity, spaced evenly along the corridor.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 30, 2026
Solicitation
Due July 9, 2026 at 3:00 PM EDT. SAM.gov, notice 28105a36586946f3a8a426676b808c08
June 30, 2026
Solicitation
Due July 9, 2026 at 3:00 PM EDT. SAM.gov, notice a5e1fef9198d4e119f0f029b6bf0edb1
July 23, 2026
Solicitation
Due August 7, 2026 at 3:00 PM EDT. SAM.gov, notice 74bdad0f41934d01984710a36c9fa92c
July 23, 2026
Solicitation
Due August 7, 2026 at 3:00 PM EDT. SAM.gov, notice 8de2bf8b7327405486a6a778ff3fc381
July 31, 2026
Solicitation
Due August 28, 2026 at 12:00 PM EDT. SAM.gov, notice 02ff19582a5a4ae3a7fa81f94eba71d9
August 26, 2026
Solicitation
Due August 28, 2026 at 12:00 PM EDT. SAM.gov, notice b1097a4265794540b53e23fffb553541
Points of contact
- Kimberly A Gomez (Contractor), Contract SpecialistKimberly.Gomez@va.gov
Also open from this buyer
- Sources Sought Building Management SystemSources soughtNAICS 811210New York36C24226Q0991Closes tomorrowSep 17
- Sources Sought Bath VAMC Generator Service ContractSources soughtNAICS 811310New York36C24226Q0917Closes tomorrowSep 17
- Castle Point PT Flooring ReplacementSolicitationSDVOSBNAICS 238160New York36C24226Q0920Closes in 2 daysSep 18
- Urgent Chiller Plant PRV Valve 2 Repair Samuel S. Stratton (Albany) VAMCPresolicitationNAICS 238220New York36C24226Q0942Closes in 2 daysSep 18
- Boiler Rental - VA Hudson Valley HCS Montrose CampusSources soughtNAICS 238220New York36C24227Q0018Closes in 2 daysSep 18