Sources sought, service-disabled veteran-owned small business set-aside
Data Drops for Lyons VA (NJ)
36C24225Q0616
Department of Veterans Affairs, 242-Network Contract Office 02. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
May 19, 2025 at 12:00 PM EDT
Closed 488 days ago. Posted May 12, 2025. Scheduled to archive August 17, 2025.
Description
As published on SAM.gov.
STATEMENT OF WORK (SOW) Installation of Data Lines 1. Contract description. Installation of data lines in specific areas of the VANJ Lyons Campus. 2. Background. This procurement is needed for a vendor to install data lines for new offices throughout the VANJ Lyon Campus 3. Scope. The Contractor to supply & install Cat-6 data lines at the VANJ Lyons Campus.
The installation includes all required labor, tools, equipment, material, wiring, connections, data ports and any other items necessary to completely install terminate and test all connections. 4. Specific Tasks.
The scope of work shall include but not be limited to the following main items: Supply & install Cat-6 data lines, as well as terminate, label, and test all connections to listed rooms in various buildings within the VANJ Lyons Campus: Building 4 CAT6 Data Cables Room 230 CAT6 Voice Cables Room 230 CAT6 Data Cable Room 231 Building 1 CAT6 Data Cables Room 330 CAT6 Data Cables Room 330 CAT6 Data Cables Rooms 313, 314, & 315 Building 16 CAT6 Data Cables 2nd floor CAT6 Fax Cable Room 231 With the support of Medical Center (IT) personnel run the system and inspect for proper operation.
With the COR or designated Medical Center personnel (IT) present, test the functionality of the equipment upon completion of repair. Test should ensure that all functions are operational. Contractor will not have access to the VA network. 5. Performance Monitoring (if applicable). Work shall be coordinated with facility thru the Contracting Office Representative (COR). COR will monitor the contractor work performance on daily basis and the contractor is required to submit daily s progress report to the COR.
6. Security Requirements. General Contractor s employees shall not enter the project site without appropriate security badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. No photography of VA premises is allowed without written permission of the Contracting Officer except as specifically required by the scope of the work.
VA reserves the right to close or shut down the project site and order General Contractor s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. 7. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). N/A 8. Other Pertinent Information or Special Considerations. a. Inspection and Acceptance Criteria.
The COR is responsible for certifying that the work done under the contract is performed to time and standard. They are also responsible to assure the inspection and acceptance of products provided incidental to services.
9. Risk Control Contractor shall take all measures for safety and infection control and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment.
Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period. 10. Place of Performance.
VA New Jersey Healthcare System Lyons Campus 151 Knollcroft Road Lyons, NJ 07939 Minimize interference of construction activities with flow of Medical Center traffic, keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. 11. Period of Performance. Contractor to start immediately after receiving the NTP, estimate completion time is 45 calendar days.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 12, 2025
Sources sought
Due May 19, 2025 at 12:00 PM EDT. SAM.gov, notice f31b69b93567448c9ca6f02b76dd9fdb
Points of contact
- Clifford S. Harrison, Contracting OfficerClifford.Harrison@va.gov718.584.9000 Ext.4680
Also open from this buyer
- NRM-CONST 526-21-105 - REPLACE FIRE ALARM SYSTEM (FY27 NRM)Sources soughtNAICS 238210New York36C24226Q0899Closes in 2 daysSep 21
- Sole Source Notice |Building Automation System Maintenance ServicesSources soughtNAICS 81121036C24226Q1001Closes in 2 daysSep 21
- RFQ: Push to Talk Radios - Brooklyn, VA Medical Center.Combined synopsis and solicitationSDVOSBNAICS 334220New York36C24226Q0995Closes in 2 daysSep 21
- Portable Two-Way Radios and AccessoriesCombined synopsis and solicitationNAICS 334220Montrose, NY36C24226Q0963Closes in 3 daysSep 22
- Sludge Management & Tank Cleaning ServicesSolicitationNAICS 562998Lyons, NJ36C24226Q0989Closes in 3 daysSep 22