Solicitation, service-disabled veteran-owned small business set-aside, first published as presolicitation
Replace Roofs and Repair Facades Phase 1 at Northport VA Medical Center 79 Middleville RD, Northport, NY 11768
36C24225B0015
Department of Veterans Affairs, 242-Network Contract Office 02. Roofing Contractors.
Awarded
Veterans Contracting Group, Inc.
$3,999,000.00 obligated so far on USAspending
Description
As published on SAM.gov.
Replace Roofs and Repair Facades Phase 1; Solicitation No. 36C24225B0015; Project No. 632-16-103 at Northport VA Medical Center, 79 Middleville Rd, Northport, NY 11768. The purpose of this amendment is to provide responses to Request for Information (RFI) and Questions, RFIs and Questions responses are hereby included. Please see below for detailed information. Request for Information/Question Responses 1. Based on the proposed phasing plan, it shows that we ll be required to proceed with the front of Buildings 61 & 62 for phase 1, and the back of Buildings 61 & 62 or phase 2. Is there any way we would be able work on both the front & back of Buildings 61 & 62 concurrently?
Response: As per contract documents, the Phase 1 is a streetside of the buildings 61&62 and the Phase 2 is a courtyard of the building 61&62. It was concerns of the extent of site disturbance, and if the GC could complete both sides concurrently which requires multiple dumpsters and staging on both sides of the building (due to the tunnels between buildings limiting the ease of access from one side of the building to the other).
The construction work will proceed in accordance with the terms outlined in the existing contract. The GC will provide construction phasing during project submittal phase for approval. If we cannot work on the entirety of both buildings at once, would it be acceptable for phase 1 to completely finish Building 61, and then move to Building 62 for phase 2?
Response: See response above. 2. Can you please provide the most recent asbestos / lead report?
Response: See attached Environmental Report. 3. Can the Superintendent fulfill the Quality Control Manager (QCM) role?
Response: The project superintendent will be held responsible for the equality of work. The QCM or CQC System manager should be on the site at all times during construction and is employed by the GC. It shall be provided alternate to serve in the event of the SDQC manager s absence. The requirements for alternate the same as for CQC Manager. 4. Is the QCM required to be onsite full-time, or can they make site visits as required for inspections?
Response: See response above. 5. Can the Superintendent fulfill the Site Safety & Health Officer (SSHO) role?
Response: The Competent person to fulfill the Site Safety & Health Officer (SSHO) role can have collateral duties as the superintendent. 6. What is the actual linear footage for the repointing?
Response: Per the G002 General Notes F & G Contactor to verify all site dimensions and existing conditions prior to work occurring. Contractors shall report any discrepancies to the govt prior to starting construction. Commencement of the work by the contractor shall imply his acceptance of all existing conditions. contractor shall verify all conditions and dimensions at the job site prior to the star of construction 7. What is the actual linear footage for the rebricking?
Response: Per the G002 General Notes F & G Contactor to verify all site dimensions and existing conditions prior to work occurring. Contractors shall report any discrepancies to the govt prior to starting construction. Commencement of the work by the contractor shall imply his acceptance of all existing conditions. contractor shall verify all conditions and dimensions at the job site prior to the star of construction 8. What is the actual linear footage for the lintels?
Response: Per the G002 General Notes F & G Contactor to verify all site dimensions and existing conditions prior to work occurring. Contractors shall report any discrepancies to the govt prior to starting construction. Commencement of the work by the contractor shall imply his acceptance of all existing conditions. contractor shall verify all conditions and dimensions at the job site prior to the star of construction Lintel quantities and approx. sizes are notes on the Hazardous Materials Lead sheets (HL100 thru HL107) 9. What is the actual linear footage of the windowsills?
Response: Per the G002 General Notes F & G Contactor to verify all site dimensions and existing conditions prior to work occurring. Contractors shall report any discrepancies to the govt prior to starting construction. Commencement of the work by the contractor shall imply his acceptance of all existing conditions. contractor shall verify all conditions and dimensions at the job site prior to the star of construction 10. Does this scope require pipe scaffolding for safety, or will a lift be acceptable in some areas?
Response: Per specification, the scaffolding shall be as approved by a professional engineer contracted by the GC. Therefore, the GC s engineer would need to review and advise. Please note Scaffolding requirements are further noted within spec section 01 35 26 as well as within G002 demo notes U , V , & AK 11. Please confirm if the replacement roof will require a 10, 20, or 30 year warranty.
Response: All warranty requirements are as noted within the specifications. Per spec section 07 31 13 ASPHALT SHINGLES section 1.7 warranty notes a 30 year warranty as well as wind & algae warranty requirements. Per spec section 07 53 23 EPDM Roofing section 1.10 warranty notes a 30 year warranty. 12. Sign-in Sheet Request.
Response: No Further Questions.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Veterans Contracting Group, Inc.
- UEI
- F2B1FMNRVJH3
- CAGE
- 558V8
- Vendor location
- Mamaroneck, NY
- Contract
- 36C24225C0056, definitive contract
- Obligated
- $3,999,000.00
- Actions
- 3 between July 31, 2025 and June 15, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 3 offers received
- Set-aside reported
- Service Disabled Veteran Owned Small Business SET-ASIDE
- Described as
- Replace Roofs and Repair Facades Phase 1 at Northport
- Match
- solicitation number 36C24225B0015 equals the FPDS solicitation identifier; same awarding office 36C242 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 13, 2025
Presolicitation
Due April 24, 2025 at 9:00 AM EDT. SAM.gov, notice 4fc43a01c424465995ed43a127ed17e8
April 4, 2025
Solicitation, originally presolicitation
Due May 6, 2025 at 10:00 AM EDT. SAM.gov, notice 189a45def1c34f688147b42387f8fe47
April 28, 2025
Solicitation
Due May 6, 2025 at 10:00 AM EDT. SAM.gov, notice fdff85e81c6b4920a72959fd8c7e403b
Points of contact
- Yingjie Yeung, Contract SpecialistYingjie.Yeung@va.gov
Also open from this buyer
- Sources Sought Bath VAMC Generator Service ContractSources soughtNAICS 811310Bath, NY36C24226Q0917Closes todaySep 17
- Sources Sought Building Management SystemSources soughtNAICS 811210Canandaigua, NY36C24226Q0991Closes todaySep 17
- Castle Point PT Flooring ReplacementSolicitationSDVOSBNAICS 238160Montrose, NY36C24226Q0920Closes tomorrowSep 18
- Urgent Chiller Plant PRV Valve 2 Repair Samuel S. Stratton (Albany) VAMCPresolicitationNAICS 238220Albany, NY36C24226Q0942Closes tomorrowSep 18
- SomnoFlo Electronic Vaporizer Systems Brand Name or EqualCombined synopsis and solicitationNAICS 334516East Orange, NJ36C24226Q0971Closes tomorrowSep 18