Solicitation, service-disabled veteran-owned small business set-aside, first published as presolicitation
MINOR-CONST 528-811 CONSOLIDATE PRIMARY CARE 1st FLOOR PHASE 1
36C24224R0033
Department of Veterans Affairs, 242-Network Contract Office 02. Commercial and Institutional Building Construction.
Response deadline
June 18, 2024 at 11:00 AM EDT
Closed 873 days ago. Posted June 12, 2024, first published April 18, 2024. Scheduled to archive July 18, 2024.
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one closed in 2024
190 like it are open now in commercial and institutional building construction
- Building 13 Stair and Roof Replacement at Castle Point VAMC
Department of Veterans Affairs, 242-Network Contract Office 02
Closes in 2 daysNov 10 - REPLACE CHILLED WATER PUMP AT THE BOILER PLANT
Department of Veterans Affairs, 242-Network Contract Office 02
Combined synopsis and solicitationSDVOSBNAICS 236220New York36C24227R0009Closes in 3 daysNov 11 - Project Labor Agreement (PLA) Notice for the Construction Services of Crowninshield/Cressy Pier and Waterfront Building at USMMA Kings Point, NY
Department of the Army, W2SD Endist New York
Sources soughtNAICS 236220Kings Point, NYW912DS27S0004Closes in 3 daysNov 11
All 190 open in commercial and institutional building construction
Description
As published on SAM.gov.
RFI Amendment 0004 1) Should we include completed copies of the Attachment 1 - Contractor Projects Form for the same three projects in our Past Performance Questionnaire?
Answer: Yes. 2) If so, do we include the completed forms under Section 1, Sub-Factor 2 Experience or Section 2 Past Performance of the Technical Proposal?
Answer: Sub-factor 2 experience. 3) Drawing M-601, General Note 1-h states that all DDC panels shall be fed from an emergency power circuit. Drawings EM101C and EM101D are showing 120V power, by the EC, to each VAV and the DDC panel in the Storage Room C-110-1, but the power is coming from normal power panels and not emergency power panels. Please clarify.
Answer: MES Response - The DDC power should be homerun to panel CEC, utilize one of the spare breakers shown on the schedules. VAV circuiting is correct to the normal source. The HVAC system in patient care areas do not require emergency power per the HVAC design manual. Drawing EM101C will be updated to show DDC circuit homerun to panel CEC, Drawing E603 will be updated with modified panel schedule for panel CEC. 4)
Addendum 003 RFI #11 Response states Spec 230923 DDC for HVAC Systems was Provided in Addendum 1 . Spec has not been received, please provide.
Answer: See attached specifications
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 18, 2024
Presolicitation
Due May 6, 2024 at 11:00 AM EDT. SAM.gov, notice d7b08140abc24689b46a107cff1097c1
May 9, 2024
Solicitation, originally presolicitation
Due June 26, 2024 at 11:00 AM EDT. SAM.gov, notice 6ec3277e01534b53b3b92158b24b3565
May 15, 2024
Solicitation
Due June 11, 2024 at 11:00 AM EDT. SAM.gov, notice 04536746af8f444e989dcfb4601b4b74
May 15, 2024
Presolicitation
Due June 11, 2024 at 11:00 AM EDT. SAM.gov, notice 5bf36066e6b7486996fd7b32a236bc94
June 4, 2024
Solicitation
Due June 18, 2024 at 11:00 AM EDT. SAM.gov, notice a8af3c93c5e147238f75592064ae091d
June 11, 2024
Solicitation
Due June 18, 2024 at 11:00 AM EDT. SAM.gov, notice e5a6a88f30cb4c40a16900325d10df81
June 12, 2024
Solicitation
Due June 18, 2024 at 11:00 AM EDT. SAM.gov, notice 4a2bf5411fb840bfb470aa62e56af975
Points of contact
- Lester S Griffith, Contract SpecialistLester.Griffith@va.gov