Skip to content
Abierto

Award notice, service-disabled veteran-owned small business set-aside, first published as combined synopsis and solicitation

WNY Air Monitoring & Hazardous Material Sampling IDIQ

36C24224Q0327

Department of Veterans Affairs, 242-Network Contract Office 02. Remediation Services.

Awarded

Trine Environmental Inc.

$0.00 obligated so far on USAspending

Description

As published on SAM.gov with the combined synopsis and solicitation of March 27, 2024.

This amendment is to answer the following vendor questions: In line 12 of the Air monitor ACM IDIQ Bid sheet I changed the Turnaround time to 1 week because it was a duplicate of line 11(they both said 24hr TAT). Please let me know if this was not a correct assumption. That is correct the turn around time for line item 12 of the Air monitor ACM IDIQ Bid sheet should have a turn around time of one week, not 24 hours.

Can you please clarify the need for Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities as a stand-alone bid item? SOW B.3.1.4 Air Monitoring (E) states Contractor shall continuously inspect and monitor conditions inside the work areas to ensure compliance with all regulations . The contractor shall collect all required area samples and analyze all air samples within 24 hours of collection.

The contractor shall continuously inspect work areas for any breaches in containment. Contractor shall maintain a daily log of all air monitoring samples and daily activity log. Containment shall stay in place until the clearance samples come back clear and has received authorization from the COR to end containment.

This means a project monitor will be required daily on task orders. An air sampler can only set up pumps/cassettes, retrieve pumps/cassettes, submit them to the lab, and maintain and air sampling log. An air sampler is not certified to continuously inspect and monitor conditions inside/outside the work area and is not required to maintain a daily activity log. Those responsibilities fall under Project Monitor.

This gives the contractor flexibility to offer the sampling technician and project monitor separately providing best value to the VA in the event more than one person is needed, rather than being billed for multiple project monitors. Can you please clarify SOW B.3.1.4 Air Monitoring (F) & (G)?  Section F states If visual inspection is acceptable, the contractor shall proceed with clearance air samples, using aggressive method. Samples shall be analyzed using the PCM method.

All PCM samples shall be analyzed using the NIOSH 7400 method. Onsite testing is preferred.  Onsite testing is not permitted by CR-56 for air sampling unless the individual is certified by NYSDOH ELAP. Otherwise, it must be performed by a laboratory. The VA agrees with this statement. Onsite testing is preferred shall be removed from section B.3.1.4 Air Monitoring (F). Section G states Final clearance samples shall be conducted in accordance with TEM NIOSH 7402 method.

TEM NIOSH samples shall be collected for areas greater than 160 square feet only. TEM for clearance samples is estimated 12 samples per clearance estimated. Contractor shall ensure that NESHAP testing is performed for all renovation and demolition work by asbestos contractors. It includes destructive sampling that AHERA does not cover.

Section G appears to be a direct contradiction to Section F. By CR-56, clearance samples can be collected and analyzed using PCM methods for any size of project. If a sample fails, all samples can be re-analyzed using TEM Method 7402. It might be more consistent throughout all task orders to request AHERA TEM sampling for all clearance samples regardless of the size of project or require PCM clearance samples regardless the size of the project per CR-56 and if they fail, then use Method 7402.   The VA agrees with this recommendation The VA agrees with this statement.

Section B.3.1.4 Air Monitoring (G) shall now state: Final clearance samples shall be conducted using PCM clearance samples regardless the size of the project per CR-56. If a sample fails, all samples shall be re-analyzed using TEM Method 7402. Â Contractor shall ensure that NESHAP testing is performed for all renovation and demolition work by asbestos contractors. All other terms and conditions remain the same.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
VX75EQLTUK61
CAGE
6R2M5
Vendor location
Brighton, MI
Contract
36C24224D0035
Obligated
$0.00, potential $2,400,000
Actions
2 between April 16, 2024 and May 29, 2026
Competition
Competed Under SAP, 7 offers received
Set-aside reported
Service Disabled Veteran Owned Small Business SET-ASIDE
Described as
Idc for Asbestos Air Monitoring and Material Sampling Services
Match
award number 36C24224D0035 equals the contract number; same awarding office 36C242 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 12, 2024

    Combined synopsis and solicitation

    Due March 26, 2024 at 12:00 PM EDT. SAM.gov, notice 2c88ab067b9445d59987b4bf49bbaf7b

  2. March 14, 2024

    Combined synopsis and solicitation

    Due April 5, 2024 at 12:00 PM EDT. SAM.gov, notice 2f8e8e5395c74ef7bdf210dcdd35ac87

  3. March 27, 2024

    Combined synopsis and solicitation

    Due April 5, 2024 at 12:00 PM EDT. SAM.gov, notice b43715a410a84d8aaae9ce2d22eeda06

  4. June 7, 2024

    Award notice, originally combined synopsis and solicitation

    Awarded to Trine Environmental Inc. Brighton 48116 for $0. SAM.gov, notice 8179a2ecaa12433f9fd7fb97b9ba091b

Points of contact