Skip to content
  • 6,811 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

Long Beach Implementation and Planning (Bldg 1, 2, and 7 and SCI) Seismic Upgrade

36C10F24R0037

Department of Veterans Affairs, Office of Construction & Facilities MGMT. Architectural Services.

Response deadline

May 31, 2024 at 7:00 PM EDT

Closed 884 days ago. Posted May 21, 2024. Scheduled to archive June 30, 2024.

Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities

This one closed in 2024

7 like it are open now in architectural services

All 7 open in architectural services

Description

As published on SAM.gov.

Long Beach VA Medical Center Implementation Plan (Projects 600-406, 408. 409 and 410) The VA Office of Construction and Facilities Management requires professional Architectural and Engineering services to prepare an implementation plan for the development of Tibor Rubin VA Medical Center at 5901 East Seventh Street, Long Beach, California. This project addresses the requirement for a comprehensive analysis and planning process assessing the projected needs and the existing sites of care.

This project provides VHA leadership with data and analysis for evaluation of strategic capital investments. This project will align capital planning with operational, programmatic, and service delivery plans in a 10-year Master Plan of Strategic Capital Investments. This Implementation Plan shall provide all necessary documentation for the elements of the master plan to move forward as separate SCIP submissions and execution via Design/ Build, or Design/ Bid Build contracts, and/or lease opportunities.

This contract includes a study of the courses of action (Upgrade or Demolish/ Construct Replacement/ Lease Replacement) and all implementation planning requirements addressing the renovation and seismic upgrade of Buildings 1, 2, and 7 on the Tibor Rubin VAMC site which are included on the Seismic Extremely High-Risk VA Inventory List.

Project No. 600-408, Seismically Mitigate Building 1 (87,971 GSF) Project No. 600-410, Seismically Mitigate Building 2 (80,326 GSF) Project No. 600-406, Seismically Mitigate Building 7 (35,444 GSF) Contract includes the development of all implementation planning requirements for Project No. 600-409 Acquire Spinal Cord Injury/ Disease, Physical Medicine & Rehabilitation, and Prosthetics .

Context and Market/ Facility Overview Degenkolb Engineers assessed Buildings 1, 2, and 7 as part of the Department of Veterans Affairs Seismic Inventory. The evaluation included ASCE 31 Tier 1 Analysis, a site visit, ASCE 31 full-building Tier 2 analysis as well as a rehabilitation scheme to address the identified deficiencies as well as provide a cost estimate which included a magnitude of order costs to enable VA to make preliminary budgetary decisions.

Due to the age of the Seismic Study and the deterioration of the aging structure, VA is seeking an assessment, as defined within this SOW, of the buildings, site, and clinical services to determine the best solution replace, repair, or relocate the functions in these buildings.

Per the SCIP submission, Project VHA22-600-2019-36449 Acquire Spinal Cord Injury/Disease, Physical Medicine & Rehabilitation, and Prosthetics will construct a 459,217 BGSF SCI/D, PM&R (Rehab), and Prosthetics Center with inpatient and outpatient SCI operations, expanded SCI Long Term Care (LTC) capability, consolidated Physical Medicine and Rehabilitation (PM&R) services, and Prosthetics Services. The project also includes the renovation of Building 150 (per SAT 138,813 SF).

In addition to creating a new program which adheres to current VA design guidelines, the project submission added a gymnasium, therapy pools, canteen, and a rooftop garden. Per the SAT, the project also includes 200 surface parking, basement utility and supply corridors, and utility connections to existing structures.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 21, 2024

    Sources sought

    Due May 31, 2024 at 7:00 PM EDT. SAM.gov, notice fc0f84a69efd4173b4eaa846cc18127b

Points of contact