Solicitation
Magnets for NNSA Beamline
367162swk
Department of Energy, Fermilab - DOE Contractor. Machine Shops.
Response deadline
June 12, 2025 at 6:00 PM EDT
Closed 463 days ago. Posted May 9, 2025, first published April 24, 2025. Scheduled to archive June 27, 2025.
Description
As published on SAM.gov.
Please see attached for Fermilab RFP# 368489swk and its associated documentation. Please ensure that you review the RFP document fully, as it outlines the evaluation criteria that will be used to score any submitted proposals, as well as how to submit a complete proposal package.
Important information related to this RFP: Proposal due date: May 12, 2025 by 5pm Central Technical questions due by May 6, 2025 by 5pm Central Proposals will be scored as per the evaluation criteria included on the RFP document, Appendix A Please see below for technical questions and answers related to this RFP: Regarding the solenoids, is the specified "length" intended to be The solenoids’ length is the length of the coil. Regarding the dipole, do you have any specification of field quality required?
Field uniformity <=1% Regarding the dipole, do you want zero degree edge angles (i.e. a pure sector magnet)? Yes Regarding the collector solenoid, this is very high field and a short length relative to its aperture. If the specified length is the magnetic length (see question above) then it may not be possible to meet this specification. In any case, it will need to be a very high-power high-current-density coil. Do you have any flexibility on this solenoid, for example to make the length longer at a lower field?
Yes, the defocusing solenoid can be made longer up to 200 mm. If 200 mm still not feasible, we can discuss further Regarding the steering magnets, we have the same question about "length" as question 1 above. In this case it seems like this is the magnetic length, given the field and steering angles provided — but please confirm either way.
The length of the steering magnet is the maximum length of the assembled magnet Regarding all magnets, do they require any support structures or adjustment features or is that out of scope? The support structure will be designed at Fermilab. Vendor will provide mounting interface. Would you be able to provide any dimensional constraints for these magnets? Available longitudinal space for the solenoids and dipole is +50 mm on each side.
There is no much of constrains in the transverse direction It looks like there is not much concern on the electrical or cooling properties, because the power supplies still need to be purchased. However, if you had some maximum current / voltage / flow values in mind that you could provide this would help me stay within your expectations. This will depend on the design choice by Vendor
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 24, 2025
Solicitation
Due May 12, 2025 at 6:00 PM EDT. SAM.gov, notice aea71c30a16240bab77271f8ce976869
April 30, 2025
Solicitation
Due May 12, 2025 at 6:00 PM EDT. SAM.gov, notice 1290c6e7e9a148d5bbc65239fe6cfad6
May 5, 2025
Solicitation
Due May 19, 2025 at 6:00 PM EDT. SAM.gov, notice c7765ced4ee04572bceaeaae4e9ae049
May 9, 2025
Solicitation
Due June 12, 2025 at 6:00 PM EDT. SAM.gov, notice 66906e0b6bfa4072ae29bd9f405c9b86
Points of contact
- Spencer Keskeskeske@fnal.gov
Also open from this buyer
- Cathodic Protection Maintenance ServicesSolicitationSmall businessNAICS 541330IllinoisSM-381952Closes todaySep 18
- RFP For PORTABLE PHASED ARRAY ULTRASONIC FLAW DETECTOR FOR NDT INSPECTIONCombined synopsis and solicitationNAICS 541380RFP386950Closes in 3 daysSep 21
- DUNE Residual Gas Analyzer StationSolicitationNAICS 339999Lead, SDRFP_387087RLPCloses in 3 daysSep 21
- Fire Sprinkler Repair_XGal_IB2A_Lab1_MI50SolicitationSmall businessNAICS 238220Batavia, ILISD-381401-ROCloses in 5 daysSep 23
- DC BlocksSolicitationNAICS 332710Batavia, ILRFP385586Closes in 7 daysSep 25