Combined synopsis and solicitation, local area set-aside
PAINTS AND FLOORS FOR GOVERNMENT HOUSING
31125PR260000241
US Coast Guard, Base Cape Cod. Painting and Wall Covering Contractors.
Response deadline
January 30, 2026 at 12:00 PM EST
Closed 230 days ago. Posted January 8, 2026. Scheduled to archive February 14, 2026.
Description
As published on SAM.gov.
1.1 SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to paint interior and exterior surfaces and refinish interior hardwood flooring at (20) selected USCG Base Cape Cod Housing units in Bourne, MA 02542. SEE SOW FOR FULL DETAILS 1.1.2 REQUIRED WORK: This list should not be considered complete. It represents the general items needed to complete the contract requirements. Prep and paint all interior surfaces to include:
walls, ceilings, doors, closets, trim, windows, moldings, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. Prep and paint all exterior doors and door trim. If a home has a garage, prep and paint garage exterior entry doors and door trim, and interior finished walls. Paint selection and finish shall be IAW the following:
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 8, 2026
Combined synopsis and solicitation
Due January 30, 2026 at 12:00 PM EST. SAM.gov, notice d1421e23a533486a911223ecf332922e
Points of contact
- ROBERT BAPTISTEROBERT.D.BAPTISTE@USCG.MIL5089686510
- ADAM GASPARREADAM.GASPARRE2@USCG.MIL5716130702