Presolicitation
Synopsis FAR 5.2 Increase Rad/Non-Rad Laundry Extension
24-DOE-AMP-0015
Department of Energy, Hanford Field Office. Industrial Launderers.
Response deadline
March 20, 2024 at 6:00 PM EDT
Closed 911 days ago. Posted March 5, 2024. Scheduled to archive April 4, 2024.
Description
As published on SAM.gov.
The Department of Energy, Richland Operations Office, requires wet wash laundry and decontamination services for regulated Radiological Protective Clothing (RPC), nonregulated items, and respirator face pieces in support of the Department of Energy, Richland Operations Office (RL), Office of River Protection (ORP), and designated Hanford Site contractors located in Richland, Washington.
The Contractor shall furnish all personnel, equipment, tools, materials, supervision, transportation, and other items necessary to perform the laundry services. The Contractor shall use commercial nuclear laundry practices while processing the Hanford Site regulated RPC. The nonregulated processing shall meet all normal commercial laundry practices. The respirator face pieces are required to be cleaned to manufacturer's specifications. This service requires the processing of each Closed Loop System (CLS) separately to prevent cross contamination of the various loops or loss of inventory.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 5, 2024
Presolicitation
Due March 20, 2024 at 6:00 PM EDT. SAM.gov, notice 1098cae526704cffaf4617b4ab8629fa
Points of contact
- Ethan Jesselethan.jessel@rl.doe.gov509-373-0584
- Valadez, Brenda S.brenda.valadez@rl.doe.gov509-376-1636