Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation

RFQ - RFQ - 19ZA6026Q0004 - FAC NEC CHILLER MAINTENANCE- FAC NEC CHILLER MAINTENANCE

19ZA6026Q0004

Department of State, U.S. Embassy Lusaka. Plumbing, Heating, and Air-Conditioning Contractors.

Response deadline

July 20, 2026 at 10:00 AM EDT

Closed 103 days ago. Posted June 18, 2026. Scheduled to archive July 15, 2026.

Get the next one like this from Department of State by email, the day it is posted.Find my opportunities

This one closed in 2026

44 like it are open now in plumbing, heating, and air-conditioning contractors

  • OR-BANDON MARSH NWR-BANDON HVAC

    Departmental Offices, FWS Contracting Activity

    SolicitationNAICS 238220Location not published140FF027Q0020
    Closes in 10 daysNov 10
  • Mechanical Support Services

    Washington Headquarters Services (Whs), Washington Headquarters Services

    Sources soughtSmall businessNAICS 238220Location not publishedATM202610140435
    Closes in 17 daysNov 17
  • HVAC Unit Replacement

    National Oceanic and Atmospheric Administration, Department of Commerce NOAA

    Combined synopsis and solicitationSmall businessNAICS 238220Location not published1305M327Q0010
    Closes in 20 daysNov 20

All 44 open in plumbing, heating, and air-conditioning contractors

Description

As published on SAM.gov.

I. GENERAL INFORMATION:
The United States Embassy in Lusaka Zambia, requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Air-Cooled Chillers


II. PROJECT REQUIREMENTS:


DESCRIPTION OF EQUIPMENT:


2 X Off-York Rotary Screw Air Cooled Chillers; Model -YCIV-0840, Size 590-1500Kw Each Chiller has 2No.x Refrigeration Systems. The Chillers are 16 years old and are in a Fair condition.


III. GENERAL REQUIREMENTS:


The Contractor under this SOW shall be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. The technician shall sign off on every task specified in the Statement of Work and will provide a typewritten copy of their report to the COR or the COR's designate within five business days of each maintenance visit.
The Government has the following manuals:


- Division 15

IV. SCOPE OF WORK - - CHILLERS MAINTENANCE


Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO) immediately. Material Safety Data Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials. Copies shall be provided to the COR for approval.


The Contractor shall inventory, supply and replace expendable parts (e.g., filters, belts, hoses, gaskets) that have become worn down due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor should inventory the supply after each visit and order replacement supplies and have them delivered on site. Maintenance materials shall be unused and are to be industry standard and intended for the task to be performed. Parts are to be OEM approved. Refrigerants are to meet the AHRI_Standard_700-2015 or most recent AHRI Standards. Refrigerants, parts and maintenance materials delivered to the post are to be new and unused. Reclaimed refrigerants are not to be delivered to posts. Reclaimed refrigerants within post compounds are to be retained and stored and may be used if not contaminated. Refrigerants shall be stored in containers clearly indicating the refrigerant type.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 18, 2026

    Solicitation

    Due July 20, 2026 at 10:00 AM EDT. SAM.gov, notice 13dfd91c50f14582a15cc30d4c2868ca

    1 revisions on SAM
    • June 18, 2026: publish, solicitation

Points of contact