Skip to content
  • 8,097 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation

Restoration of Left and Right Balcony of the CMR

19EZ8025Q0017

Department of State, U.S. Embassy Prague. Residential Remodelers.

Response deadline

July 11, 2025 at 11:00 AM EDT

Closed 485 days ago. Posted June 27, 2025. Scheduled to archive July 26, 2025.

Get the next one like this from Department of State by email, the day it is posted.Find my opportunities

This one closed in 2025

4 like it are open now in residential remodelers

All 4 open in residential remodelers

Description

As published on SAM.gov.

Restoration of Left and Right Balcony on the South-East Facade of the CMR The U.S. Embassy in Prague, Czech Republic, intends to issue a solicitation for construction services to restore the left and right balconies on the south-east facade of the Chief of Mission Residence (CMR). The project involves eliminating water infiltration into the balcony slabs and renovating the damaged balcony structures to ensure their long-term use.

Scope of Work: The contractor will be responsible for: Restoring the left and right balconies, which are axially symmetrical and exhibit similar damage. Addressing structural issues caused by expansion movements of steel railings and water infiltration. Ensuring high-quality renovation work while minimizing disruption to the building, which serves as both a residence and a venue for official functions. Completing the project in accordance with the specifications outlined in the project documentation.

The contractor shall: Provide all necessary personnel, equipment, materials, tools, and supervision to complete the services as per the technical requirements. Execute the work diligently in accordance with a negotiated firm fixed price and performance period. Prepare and submit reports, bill of materials, product literature, drawings, specifications, quality control schedules, safety plan, and construction costs.

Ensure professional quality, technical accuracy, and coordination of all services furnished under this contract. Identify a Project Site Manager responsible for overall project management and provide as-built construction documents and warranty documentation. Examine all documents and visit the site on the site-inspection day to fully inform themselves of all conditions and limitations applied to the work. The contractor must submit a general phasing plan with a construction schedule as part of the cost proposal.

The contractor must comply with Czech National Standards or U.S. codes/standards, whichever is more stringent. The contractor must ensure safety and adhere to local labor laws and regulations.

Period of Performance: The project must be completed within 100 days from the date of contract award.

Location: CMR Building, Prague 6, Czech Republic.

Contract Type: Firm Fixed Price.

Solicitation Release Date: The solicitation is expected to be released on or about July 11, 2025. Interested parties are advised to monitor the SAM.gov website for updates.

Solicitation Closing Date: The solicitation is expected to be closed on August 8, 2025. Interested parties are advised to monitor the SAM.gov website for updates.

Eligibility: This acquisition is open to contractors experienced in repairing historically significant buildings. Contractors must provide evidence of relevant experience with at least three reference projects completed in the last five years.

Application for Solicitation Documentation Checklist: In applying for the solicitation material, vendors must acknowledge compliance with the following requirements: In accordance with DOSAR 652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999), the contractor must possess authorization to operate and do business in the Czech Republic. Contractors must be registered in the System for Award Management (SAM). Registration details can be found at https://sam.gov.

Failure to provide the above documentation when submitting a proposal may result in the proposal being found technically unacceptable and removed from the competition without further discussions. Interested contractors must submit a firm fixed price cost proposal, including: A statement of experience in repairing historically significant buildings. A Quality Control Schedule (QCS) and Project Safety Plan (PSP). A Bill of Materials (BOM), product literature, and standard specification submittals. A Contractor’s Installation Guarantee covering the work, labor, and equipment for one year.

Solicitation Package: The solicitation package/documents shall not be placed on SAM.gov. Vendors interested in the detailed solicitation package may request it at pragueGSOprocurement@state.gov no sooner than July 11, 2025. Disclaimer: This pre-solicitation notice does not commit the U.S. Department of State to award a contract, nor does it obligate the U.S. Department of State to pay for any costs incurred in the preparation and submission of proposals. Solicitation and award will be subject to the laws and regulations of the United States of America. This requirement is being competed utilizing full and open competition procedures. End of Notice

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 27, 2025

    Presolicitation

    Due July 11, 2025 at 11:00 AM EDT. SAM.gov, notice 94c38fc8a34c4df889b195149a06e7f5

Points of contact