Combined synopsis and solicitation
Non-CAA space chiller and fan coil unit replacement project
19EN1025Q0127
Department of State, U.S. Embassy Tallinn. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
May 5, 2025 at 5:00 AM EDT
Closed 548 days ago. Posted April 11, 2025, first published March 18, 2025. Scheduled to archive May 5, 2025.
Get the next one like this from Department of State by email, the day it is posted.Find my opportunities
This one closed in 2025
47 like it are open now in plumbing, heating, and air-conditioning contractors
- OR-BANDON MARSH NWR-BANDON HVAC
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 238220Location not published140FF027Q0020Closes in 6 daysNov 10 - Mechanical Support Services
Washington Headquarters Services (Whs), Washington Headquarters Services
Sources soughtSmall businessNAICS 238220Location not publishedATM202610140435Closes in 13 daysNov 17 - HVAC Replacement - MI
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 238220Location not published140FF027R0008Closes in 13 daysNov 17
All 47 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
This project describes the replacement of the existing building's cooling system with at least an equivalent system. The goal is to replace the entire cooling system and auxiliary structures. To reduce construction costs, a solution will be proposed that is as similar as possible to the existing system, and ultimately, suggestions for improving the system will be presented.
The Contractor shall provide and install (1) new Air-cooled chiller with integrated hydraulic module (2 high pressure pumps (compressors), expansion vessel), and associated connection piping, controls, electrical conduit/wiring and all necessary mechanical and electrical accessories to provide a fully functioning system that meets the project requirements for replacement in kind. The new chiller must have Refrigerant Filter-Drier Liquid Line and Refrigerant Suction Line Filter-Drier.
The new chiller will have two sections/sides and have the option to switch to the other side when one section (compressor) fails. The Contractor shall use the current wall penetrations and make as little modifications as applicable. The contractor shall provide FCUs (Fan Coil Units) that will fit in the current suspended ceiling opening, so that the suspended ceiling wouldn’t need any modifications.
The new FCUs will fit the existing suspended ceiling opening and the FCU verge/collar will cover the opening so that the new FCU will look aesthetically correct. The Contractor shall remove the existing chiller from the metal frame. Removal shall include all associated piping and wiring that will not be used as part of the new work. No systems, equipment or components are to be abandoned in place.
All chilled water (glycol) piping except the part on the 1st floor South related to EVI, AmericanSeries (CAHG09) FCU, wall thermostat and cooled water piping section to the hallway door will be removed and disposed. Devices associated with the chiller and/or main chilled water branch piping shall be removed, disposed and new installed, such as gauges, thermostats, isolation valves, balancing valves, and strainers Please see the RFQ foor full and detailed scope of work and requirements.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Mrs. Hind TaziTaziH@state.gov3726688154
- Katrin Lipstal (Procurement Agent)Lipstalk@state.gov003726688173