Solicitation, first published as presolicitation
Steel tower and glass facade for an elevator
19AU9025Q0008
Department of State, U.S. Embassy Vienna. Other Foundation, Structure, and Building Exterior Contractors.
Response deadline
July 2, 2025 at 4:00 AM EDT
Closed 494 days ago. Posted June 2, 2025, first published May 12, 2025. Scheduled to archive July 17, 2025.
Get the next one like this from Department of State by email, the day it is posted.Find my opportunities
This one closed in 2025
4 like it are open now in other foundation, structure, and building exterior contractors
- 542-21-113 | Correct FCA Deficiencies – Repair Water Penetration | NCO 4 Construction East (VA-26-00020634) (VA-26-00020634)
Department of Veterans Affairs, 244-Network Contract Office 4
PresolicitationSDVOSBNAICS 238190Coatesville, PA36C24426B0003Closes in 5 daysNov 13 - WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Department of the Air Force, FA8137 AFSC Pzioc
SolicitationSmall businessNAICS 238190OklahomaFA813727R0001Closes in 8 daysNov 16 - AZ Coconino NF Flagstaff Garage door Replacement and Service
Forest Service, Usda-Fs, Csa East 12
Combined synopsis and solicitationSmall businessNAICS 238190Flagstaff, AZ12445127Q0004Closes in 15 daysNov 23
All 4 open in other foundation, structure, and building exterior contractors
Description
As published on SAM.gov.
This solicitation covers the design of a steel tower with glass façade outside of a U.S. Government-owned building for an elevator with vestibule for accessibility from the main entrance to 2 upper floors, to meet the ABA (American Architectural Barriers Act) requirements.
The project involves - but is not limited to - the following : Workshop drawings, factory and assembly planning of a steel tower with glass façade for an elevator over 3 floors (height ca.10m), outside of the building, according to the American Architectural Barriers Act (ABA guidelines). Delivery and assembly of the steel tower with glass façade according to the American Architectural Barriers Act (ABA guidelines).
Coordinated design with the general planner’s design team and the elevator contractor: The elevator will be mounted inside the steel-glass tower over 3 floors. Coordinated cooperation on site with all project participants.
Temporary massive dust wall outdoor (weather protection) protection measures and materials, scaffolds, lifting platforms, material lifts, etc. Commissioning and Certificates for fire protection, safety glass qualification, building physics (thermal qualification, sun protection, sound-protection) All contractors must be registered n the SAM (System Award Management) Database https://www.sam.gov prior to submitting an offer pursuant to FAR provision 52.204-7.
Therefore, prospective offerors are encouraged to register prior to the submittal of quotations/proposals. Estimate size of the project: estimated construction cost per range according to FAR 36-204: between $ 100,000 and $ 250,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.