Presolicitation
Operations and Maintenance (O&M) Services for the SBIWTP
191BWC27R0001
International Boundary and Water Commission: US-Mexico, Internat. Boundary and Water Comm.. Sewage Treatment Facilities.
Response deadline
September 18, 2026 at 7:00 PM EDT
Closed 44 days ago. Posted August 26, 2026, first published August 26, 2026. Scheduled to archive September 18, 2026.
Get the next one like this from International Boundary and Water Commission: US-Mexico by email, the day it is posted.Find my opportunities
This one closed 44 days ago
5 like it are open now in sewage treatment facilities
- Operations and Maintenance (O&M) Services for the SBIWTP
International Boundary and Water Commission: US-Mexico, Internat. Boundary and Water Comm.
SolicitationNAICS 221320California191BWC26R0009Closes in 66 daysJan 6, 2027 - GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ
National Park Service, DSC Contracting Services Division
PresolicitationNAICS 221320Arizona140P2025R0093Closes tomorrowNov 2 - GRCA 257282 - Replace Wastewater Plant at South Ri
National Park Service, DSC Contracting Services Division
SolicitationNAICS 221320Arizona140P2026R0101Closes in 17 daysNov 18
Description
As published on SAM.gov.
1. Overview
The United States Section of the International Boundary and Water Commission (USIBWC) intends to issue a Request for Proposals (RFP) for a performance‑based, full‑service Operations and Maintenance (O&M) contract for the South Bay International Wastewater Treatment Plant (SBIWTP) and associated conveyance assets in San Diego County, California. The planned contract type is Firm‑Fixed‑Price (FFP) with defined performance outcomes and metrics.
Place of Contract Performance: San Diego County, CA (SBIWTP and associated conveyance systems)
Estimated Solicitation Release Date: On or about September 18, 2026
Response Time / Closing Date: Not less than 60 calendar days after issuance (final calendar to be specified in the RFP)
Contract Type: Firm‑Fixed‑Price (FFP)
Period of Performance: Base year plus four (4) one‑year option periods
Contact Point: Contracting Officer (CO), USIBWC Acquisition Division — Philip Johnson at Philip.johnson@ibwc.gov
2. Description of Requirement (FAR 5.207(c))
USIBWC seeks a qualified O&M contractor to operate, maintain, and manage SBIWTP and its conveyance infrastructure (e.g., canyon collectors, pump stations, junction boxes, and South Bay Land/Ocean Outfall interfaces). Services include day‑to‑day plant operations; maintenance, servicing, repair and replacement; influent/effluent sampling and laboratory testing; system monitoring and data recording; quality control; reporting; asset and fleet management; grounds and housekeeping; chemical supply; and related services necessary for continuous, compliant operation.
The O&M contractor will coordinate closely with the Government’s Progressive Design‑Build (PDB) team during ongoing rehabilitation and expansion activities. The Government remains legally responsible for permit compliance; the contractor supports compliance through operations, monitoring, and reporting aligned to performance metrics.
3. Source‑Selection Approach
USIBWC anticipates using a Highest Technically Rated with a Fair & Reasonable Price (HTR‑FRP) method under FAR Part 15, consistent with USIBWC’s RFO Class Deviation. Award is expected to be made to the highest technically rated responsible offeror whose price is determined fair and reasonable; no tradeoff analysis would be conducted. Final method will be confirmed in the RFP.
6. Important Notes
• This is a presolicitation notice only; it does not solicit proposals.
• All official instructions to offerors, proposal submission requirements, evaluation criteria, and terms/conditions will be in the RFP posted to SAM.gov.
4. Tentative Acquisition Milestones
Presolicitation Notice: On or about September 18, 2026
RFP Issuance: Within 2–4 weeks after presolicitation (target)
Proposal Due Date: Not less than 60 calendar days after RFP issuance
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 26, 2026
Presolicitation
Due September 18, 2026 at 7:00 PM EDT. SAM.gov, notice 4298e0cdc3fa4c22ae2587b8733ea1c6
2 revisions on SAM
- August 26, 2026: publish, presolicitation
- August 26, 2026: publish, presolicitation
August 26, 2026
Presolicitation
Due September 18, 2026 at 7:00 PM EDT. SAM.gov, notice aac95915e7214788acb3c48edefe7e0e
2 revisions on SAM
- August 26, 2026: publish, presolicitation
- August 26, 2026: publish, presolicitation
Points of contact
- Philip Johnsonphilip.johnson@ibwc.gov9152559324
- Seone Michael Jonesseone.jones@ibwc.gov9158324120