Definitize Letter Contract Emergency Pump Replacement

191BWC23C0019

International Boundary and Water Commission: US-Mexico, Internat. Boundary and Water Comm.. Sewage Treatment Facilities.

Awarded

Veolia Water West Operating Services Inc.

$2,015,359.06 obligated so far on USAspending

Description

As published on SAM.gov.

Tropical Storm Hilary exacerbated vulnerabilities at the South Bay International Wastewater Treatment Plant (SBIWTP), which was already at risk. The storm accelerated damage primarily through excessive flows and an influx of debris. Trash, sediment, and debris carried by the excessive flows caused entanglement in impellers and check valves, leading to pump failures.

On September 30, 2023, a letter contract for construction was issued, not to exceed $1,500,000.00, for the purchase of parts and rehabilitation of the Non-Potable Water Motors and Pumps, following Federal Acquisition Regulation (FAR) guidelines. The award notification on SAM.gov specified the replacement of Waste Activated Sludge (WAS) Pumps, Activated Sludge Tanks (AST) Intermediate Mixed Liquor Pumps, and non-potable water pumps at SBIWTP.

The award also included a Sole Source Justification and Approval (J&A) in accordance with FAR 6.305. Veolia, the Operation and Maintenance Contractor, possesses the expertise and knowledge of the Wastewater Treatment Plant necessary to expedite repairs. Controls were implemented in the letter contract to mitigate cost risks, including the requirement for three quotes from vendors when purchasing parts.

Additionally, the repair proposal involved submissions from three Contractors and subcontracting to Small Businesses wherever possible. Total Award after modification $3,992,690.38.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
VQTPF9KTZAY8
CAGE
61E43
Vendor location
Boston, MA
Contract
191BWC23C0019, definitive contract
Obligated
$2,015,359.06, current value $3,515,359
Actions
3 between April 23, 2024 and August 30, 2024
Competition
Not Competed, 1 offer received
Set-aside reported
No Set Aside Used.
Described as
If Emergency Repairs Are Not Begun Sbiwtp Will Risk Significant Sewage Released Into the Tijuana River and Pacific Ocean and a Serious Health Risk to People in the Area.
Match
solicitation number 191BWC23C0019 was reused as the contract number; same sub-agency 19BM (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 31, 2024

    Special notice, originally award notice

    SAM.gov, notice 542777093fba4dc99afe791c5eed84d3

Points of contact