Special notice
Definitize Letter Contract Emergency Pump Replacement
191BWC23C0019
International Boundary and Water Commission: US-Mexico, Internat. Boundary and Water Comm.. Sewage Treatment Facilities.
Awarded
Veolia Water West Operating Services Inc.
$2,015,359.06 obligated so far on USAspending
Get the next one like this from International Boundary and Water Commission: US-Mexico by email, the day it is posted.Find my opportunities
This one was awarded in 2024
5 like it are open now in sewage treatment facilities
- Operations and Maintenance (O&M) Services for the SBIWTP
International Boundary and Water Commission: US-Mexico, Internat. Boundary and Water Comm.
SolicitationNAICS 221320California191BWC26R0009Closes in 65 daysJan 6, 2027 - GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ
National Park Service, DSC Contracting Services Division
PresolicitationNAICS 221320Arizona140P2025R0093Closes todayNov 2 - GRCA 257282 - Replace Wastewater Plant at South Ri
National Park Service, DSC Contracting Services Division
SolicitationNAICS 221320Arizona140P2026R0101Closes in 16 daysNov 18
Description
As published on SAM.gov.
Tropical Storm Hilary exacerbated vulnerabilities at the South Bay International Wastewater Treatment Plant (SBIWTP), which was already at risk. The storm accelerated damage primarily through excessive flows and an influx of debris. Trash, sediment, and debris carried by the excessive flows caused entanglement in impellers and check valves, leading to pump failures.
On September 30, 2023, a letter contract for construction was issued, not to exceed $1,500,000.00, for the purchase of parts and rehabilitation of the Non-Potable Water Motors and Pumps, following Federal Acquisition Regulation (FAR) guidelines. The award notification on SAM.gov specified the replacement of Waste Activated Sludge (WAS) Pumps, Activated Sludge Tanks (AST) Intermediate Mixed Liquor Pumps, and non-potable water pumps at SBIWTP.
The award also included a Sole Source Justification and Approval (J&A) in accordance with FAR 6.305. Veolia, the Operation and Maintenance Contractor, possesses the expertise and knowledge of the Wastewater Treatment Plant necessary to expedite repairs. Controls were implemented in the letter contract to mitigate cost risks, including the requirement for three quotes from vendors when purchasing parts.
Additionally, the repair proposal involved submissions from three Contractors and subcontracting to Small Businesses wherever possible. Total Award after modification $3,992,690.38.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- UEI
- VQTPF9KTZAY8
- CAGE
- 61E43
- Vendor location
- Boston, MA
- Contract
- 191BWC23C0019, definitive contract
- Obligated
- $2,015,359.06, current value $3,515,359
- Actions
- 3 between April 23, 2024 and August 30, 2024
- Competition
- Not Competed, 1 offer received
- Set-aside reported
- No Set Aside Used.
- Described as
- If Emergency Repairs Are Not Begun Sbiwtp Will Risk Significant Sewage Released Into the Tijuana River and Pacific Ocean and a Serious Health Risk to People in the Area.
- Match
- solicitation number 191BWC23C0019 was reused as the contract number; same sub-agency 19BM (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 31, 2024
Special notice, originally award notice
SAM.gov, notice 542777093fba4dc99afe791c5eed84d3
Points of contact
- Philip Johnsonphilip.johnson@ibwc.gov