Solicitation
USP LEE Replace Cooling Towers
15BBNF26Q00000003A
Federal Prison System / Bureau of Prisons, Fao. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
April 2, 2026 at 4:00 PM EDT
Closed 213 days ago. Posted March 10, 2026. Scheduled to archive April 17, 2026.
Get the next one like this from Federal Prison System / Bureau of Prisons by email, the day it is posted.Find my opportunities
This one closed in 2026
44 like it are open now in plumbing, heating, and air-conditioning contractors
- Clinical Lab Bypass Loop System Install
Department of Veterans Affairs, 246-Network Contracting Office 6
Sources soughtNAICS 238220Richmond, VA36C24627Q0088Closes tomorrowNov 2 - FY27 HVAC Maintenance Service
Department of the Army, W6QM Micc-Ft Belvoir
Sources soughtSmall businessNAICS 238220VirginiaPANMCC26P0000056336Closes in 12 daysNov 13 - R-410A LEAK DETECTORS (Bldgs 750, 751 & 768)
Department of the Air Force, FA4460 19 Cons Pka
SolicitationSmall businessNAICS 238220Anywhere in the USFA446027Q0006Closes tomorrowNov 2
All 44 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
The Federal Bureau of Prisons (FBOP), United States Penitentiary (USP) Lee County, located at Hickory Flats Road, Pennington Gap, VA 24277 intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to deliver all products and services described in the Scope of Work section of this statement of work. Currently, the institutional Powerhouse has two water cooling towers located in the CUB (Central Utility Building). These two cooling towers are responsible for cooling the water for the institutional chillers. The cooling towers are the original cooling towers that have been in operation for twenty-five years and are beginning to experience numerous and various mechanical failures. This is due to their constant operational status and lifespan overuse. One of the cooling towers is currently inoperable and we are solely relying on the other cooling tower to produce the amount of chilled water that two has produced in the past. The contractor will provide all necessary labor, parts, delivery, removal, disposal, installation, startup and training of staff for the total replacement of the two institutional cooling towers. The cooling towers must be in compliance with approved specifications
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 5 Drawings.pdf569 KB, March 10, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 10, 2026
Solicitation
Due April 2, 2026 at 4:00 PM EDT. SAM.gov, notice b6b1b8d5c6dc411e94476cd5c6248410
2 revisions on SAM
- March 10, 2026: publish, solicitation
- March 10, 2026: publish, solicitation
Points of contact
- ronald calandrarcalandra@bop.gov