Skip to content
  • 6,816 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

FCI Cumberland-Refurbish Lift Station

15B10726Q00000055

Federal Prison System / Bureau of Prisons, Fci Cumberland. Water and Sewer Line and Related Structures Construction.

Response deadline

August 13, 2026 at 10:00 AM EDT

Closed 79 days ago. Posted September 4, 2026, first published July 15, 2026. Scheduled to archive August 28, 2026.

Get the next one like this from Federal Prison System / Bureau of Prisons by email, the day it is posted.Find my opportunities

This one closed in 2026

25 like it are open now in water and sewer line and related structures construction

All 25 open in water and sewer line and related structures construction

Description

As published on SAM.gov.

Description:
The Federal Bureau of Prisons (FBOP), FCI Cumberland, intends to issue a solicitation to refurbish the institution’s wastewater lift station. Work includes demolition and removal of existing pumps, grinder, auger, electrical disconnects, transfer switch, and controls; installation of new lift station equipment; electrical upgrades; controls modernization; testing; commissioning; and staff training. All work must maintain continuous sewage system operation and comply with Federal, State, Local, NEC, NFPA 820, OSHA, and FBOP security requirements.

Place of Performance:
Federal Correctional Institution Cumberland
14601 Burbridge Rd. SE
Cumberland, MD 21502

Scope of Work Includes:               (See attached Statement of Work)
• Removal and disposal of existing lift station equipment.
• Installation of new stainless‑steel NEMA 4X control panel with PLC/relay logic, VFDs, starters, surge protection, HOA switches.
• New level‑sensing system with redundancy and audio/visual alarms.
• Installation of new grinder, auger, diverters, three wet‑well pumps, and three spare pumps.
• Replacement of incoming disconnects, automatic transfer switch, and associated wiring.
• Upgraded grounding, conduits, surge/lightning protection, and fail‑safe logic.
• Full functional testing, hydrostatic testing, manufacturer startup, and calibration.
• Minimum 6 hours of on‑site training and provision of all as‑built documentation, O&M manuals, warranties, schematics, and PLC programming.

Evaluation Factors:

Award will be made on best value. Price, past performance, and specifications will be evaluated.

Amendment to solicitation to add site visit:

Site visit scheduled for July 30, 2026 at 10 AM EST

Fill out NCIC and Residency forms attached to attend site visit. Please email completed background paperwork to blogsdon@bop.gov before July 28, 2026 at 10 AM to allow time for processing background checks. 

July 30,2026 - Site Visit Meeting Minutes added. Solicitation Modification added. Additional Pictures of Lift Station added. 

August 6, 2026 - Site Visit Answers and as-builts added. Picture of Wet Well Pump added.

Quotes are due August 13, 2026. 10 AM (EST)

Please email quotes to Brian Logsdon at blogsdon@bop.gov

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 15, 2026

    Combined synopsis and solicitation

    Due July 30, 2026 at 10:00 AM EDT. SAM.gov, notice 65eebd200bca4f4299e479ef479b5ad1

    7 revisions on SAM
    • September 4, 2026: publish, combined synopsis and solicitation
    • September 4, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
    • July 21, 2026: publish, combined synopsis and solicitation
    • July 15, 2026: publish, combined synopsis and solicitation
  2. July 21, 2026

    Combined synopsis and solicitation

    Due August 13, 2026 at 10:00 AM EDT. SAM.gov, notice 9211188e536c4fd6adb0825226644b70

    7 revisions on SAM
    • September 4, 2026: publish, combined synopsis and solicitation
    • September 4, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
    • July 21, 2026: publish, combined synopsis and solicitation
    • July 15, 2026: publish, combined synopsis and solicitation
  3. July 30, 2026

    Combined synopsis and solicitation

    Due August 13, 2026 at 10:00 AM EDT. SAM.gov, notice ef40105c6529497289e21023542f3369

    7 revisions on SAM
    • September 4, 2026: publish, combined synopsis and solicitation
    • September 4, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
    • July 21, 2026: publish, combined synopsis and solicitation
    • July 15, 2026: publish, combined synopsis and solicitation
  4. August 6, 2026

    Combined synopsis and solicitation

    Due August 13, 2026 at 10:00 AM EDT. SAM.gov, notice 27ff05c1801746b4852f0ac6c9754e63

    7 revisions on SAM
    • September 4, 2026: publish, combined synopsis and solicitation
    • September 4, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
    • July 21, 2026: publish, combined synopsis and solicitation
    • July 15, 2026: publish, combined synopsis and solicitation
  5. August 6, 2026

    Combined synopsis and solicitation

    Due August 13, 2026 at 10:00 AM EDT. SAM.gov, notice a779795195c843c890aa9b7c56278abe

    7 revisions on SAM
    • September 4, 2026: publish, combined synopsis and solicitation
    • September 4, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
    • July 21, 2026: publish, combined synopsis and solicitation
    • July 15, 2026: publish, combined synopsis and solicitation
  6. September 4, 2026

    Combined synopsis and solicitation

    *Cancel Solicitation*-FCI Cumberland-Refurbish Lift Station

    Due August 13, 2026 at 10:00 AM EDT. SAM.gov, notice 061726184b784f62aa863c38d7f4ffad

    7 revisions on SAM
    • September 4, 2026: publish, combined synopsis and solicitation
    • September 4, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
    • July 21, 2026: publish, combined synopsis and solicitation
    • July 15, 2026: publish, combined synopsis and solicitation
  7. September 4, 2026

    Combined synopsis and solicitation

    Due August 13, 2026 at 10:00 AM EDT. SAM.gov, notice d29354bfe76043fe983612e1a98ba160

    7 revisions on SAM
    • September 4, 2026: publish, combined synopsis and solicitation
    • September 4, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • August 6, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
    • July 21, 2026: publish, combined synopsis and solicitation
    • July 15, 2026: publish, combined synopsis and solicitation

Points of contact