Skip to content
  • 6,799 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

TRAIL BRIDGE YOCKANOOKANY SECTION

140P5225R0019

National Park Service, Ser West. Highway, Street, and Bridge Construction.

Awarded

That Makes Sense, LLC

$33,500.00 obligated so far on USAspending

Get the next one like this from National Park Service by email, the day it is posted.Find my opportunities

This one was awarded in 2025

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Description

As published on SAM.gov.

Amendment 0002 We had a few questions so we are sharing the answers below. All other terms, conditions, and times remain the same. BIDS ARE DUE JULY 17,2025 AT 2:00CT. One question, I noticed the highlighted area regarding delegated design on pdf page 2. Does this mean that minor design details can be delegated to the contractor? The delegated design would be for the pre-fabricated bridges. Those are the only elements that are not ¿designed¿ since they will be built by a manufacturer.

Can the diaphragms be bolted instead of welded to the girders? Yes they can. Does the diaphragm connection bracket need to be on both sides of the diaphragm in addition to each end of the diaphragm? Yes Do the bearing plates need to be welded to the girders? Yes they do. Do the hardware, girders, bearing plates, diaphragms, nailer angle need to be coated in any way? It would be best if they were to minimize corrosion over time.

They can be galvanization (zinc coated), epoxy coated, or powder coated Do we need to include the steel angle nailer bracket if so please provide the spacing? The nailers are spaced a maximum of 5¿ oc along the length of the bridge. They can be less than 5¿ to allow for them to be evenly spaced along the length. Would these minor design alterations fall within that delegated design? Or should we maintain no deviation from the design we have now? Typically, not. It would be best to maintain no deviation from the plans

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
YDPLLJEYLNS3
CAGE
8SYU1
Vendor location
Buford, GA
Contract
140P5225C0009, definitive contract
Obligated
$33,500.00
Actions
1 between July 31, 2025 and July 31, 2025
Competition
Competed Under SAP, 8 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
FY25 Natr Trail Bridge Yockanookany Section
Match
solicitation number 140P5225R0019 equals the FPDS solicitation identifier; same awarding office 140P52 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 2, 2025

    Combined synopsis and solicitation

    Due July 17, 2025 at 3:00 PM EDT. SAM.gov, notice 013e18156e2741a8880d3d032bb8323f

  2. July 3, 2025

    Combined synopsis and solicitation

    Due July 17, 2025 at 3:00 PM EDT. SAM.gov, notice 461e5570630a40408d24c5e277460f17

  3. July 16, 2025

    Combined synopsis and solicitation

    Due July 17, 2025 at 3:00 PM EDT. SAM.gov, notice 66bc1102068a4743af5a7117a3be8cf6

Points of contact