Combined synopsis and solicitation, total small business set-aside
TRAIL BRIDGE YOCKANOOKANY SECTION
140P5225R0019
National Park Service, Ser West. Highway, Street, and Bridge Construction.
Awarded
$33,500.00 obligated so far on USAspending
Description
As published on SAM.gov.
Amendment 0002 We had a few questions so we are sharing the answers below. All other terms, conditions, and times remain the same. BIDS ARE DUE JULY 17,2025 AT 2:00CT. One question, I noticed the highlighted area regarding delegated design on pdf page 2. Does this mean that minor design details can be delegated to the contractor? The delegated design would be for the pre-fabricated bridges. Those are the only elements that are not ¿designed¿ since they will be built by a manufacturer.
Can the diaphragms be bolted instead of welded to the girders? Yes they can. Does the diaphragm connection bracket need to be on both sides of the diaphragm in addition to each end of the diaphragm? Yes Do the bearing plates need to be welded to the girders? Yes they do. Do the hardware, girders, bearing plates, diaphragms, nailer angle need to be coated in any way? It would be best if they were to minimize corrosion over time.
They can be galvanization (zinc coated), epoxy coated, or powder coated Do we need to include the steel angle nailer bracket if so please provide the spacing? The nailers are spaced a maximum of 5¿ oc along the length of the bridge. They can be less than 5¿ to allow for them to be evenly spaced along the length. Would these minor design alterations fall within that delegated design? Or should we maintain no deviation from the design we have now? Typically, not. It would be best to maintain no deviation from the plans
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- That Makes Sense, LLC
- UEI
- YDPLLJEYLNS3
- CAGE
- 8SYU1
- Vendor location
- Buford, GA
- Contract
- 140P5225C0009, definitive contract
- Obligated
- $33,500.00
- Actions
- 1 between July 31, 2025 and July 31, 2025
- Competition
- Competed Under SAP, 8 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- FY25 Natr Trail Bridge Yockanookany Section
- Match
- solicitation number 140P5225R0019 equals the FPDS solicitation identifier; same awarding office 140P52 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 2, 2025
Combined synopsis and solicitation
Due July 17, 2025 at 3:00 PM EDT. SAM.gov, notice 013e18156e2741a8880d3d032bb8323f
July 3, 2025
Combined synopsis and solicitation
Due July 17, 2025 at 3:00 PM EDT. SAM.gov, notice 461e5570630a40408d24c5e277460f17
July 16, 2025
Combined synopsis and solicitation
Due July 17, 2025 at 3:00 PM EDT. SAM.gov, notice 66bc1102068a4743af5a7117a3be8cf6
Points of contact
- Clark, TaraTara_Clark@nps.gov6623720363