Special notice
Notice of Intent to Sole Source
140P5126Q0034
National Park Service, Ser East Mabo. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
May 11, 2026 at 9:00 AM EDT
Closed 178 days ago. Posted May 13, 2026. Scheduled to archive June 12, 2026.
Get the next one like this from National Park Service by email, the day it is posted.Find my opportunities
This one closed in 2026
43 like it are open now in plumbing, heating, and air-conditioning contractors
- OR-BANDON MARSH NWR-BANDON HVAC
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 238220Location not published140FF027Q0020Closes in 5 daysNov 10 - Mechanical Support Services
Washington Headquarters Services (Whs), Washington Headquarters Services
Sources soughtSmall businessNAICS 238220Location not publishedATM202610140435Closes in 12 daysNov 17 - HVAC Replacement - MI
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 238220Location not published140FF027R0008Closes in 12 daysNov 17
All 43 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement. This notice in no way obligates the Government to award any contract nor is the Government responsible for any costs incurred by responding to this notice.
Required Services:
The work is to be done at the Martin Luther King Jr. National Historic Park Historic Ebenezer Church. This building supports the operations of the Martin Luther King Jr. National Historical Park district. This structure was built in 1922 in the neighborhood where Dr. Martin Luther King Jr. was born, it is a part of one of the parks main exhibits.
1. PROJECT OVERVIEW The Contractor shall provide all necessary labor, materials, equipment, and supervision to install three (3) 3-ton HVAC systems in the attic of Ebenezer Baptist Church. Work will include integration with portions of the existing ductwork system, installation of electrical disconnects, refrigerant lines, controls, and commissioning of equipment.
2. EQUIPMENT TO BE FURNISHED The Contractor will provide the following equipment (quantities listed apply to each of the three systems):
¿ Model 27SCA560A005 ¿ 5 Ton Heat Pump ¿ Model FJ5ANXD60L00 ¿ Carrier Air Handler ¿ Model FF-3001F15 ¿ 15 kW Heat Strip ¿ Thermostats: THM5320R1000 / THM6000R7001/U / TH6320R004 ¿ Redlink Internet Interface ¿ Accessories as indicated ¿ Carrier brand components throughout ¿ Central de-humidification (if applicable)
3. WORK INCLUDED The Contractor shall perform the following tasks: Remove and dispose of existing units as required.
¿ Install three (3) new HVAC systems in attic.
¿ Utilize a portion of the existing supply-air duct system
¿ Modify existing ductwork where necessary
¿ Insulate return duct as required
¿ Install equipment pads
¿ Install new condensate gravity drain (pump as needed)
¿ Install new refrigerant line sets
¿ Install new disconnect switches (208/230V, single phase)
¿ Gas line work as needed
¿ Install programmable thermostats
¿ Perform system startup, testing, and commissioning
4. ELECTRICAL SCOPE
¿ Electrical wiring to be provided by others (not included in this quote)
¿ Contractor will install required new disconnect switches
¿ Final connections to existing power supply where applicable
5. EXCLUSIONS
¿ New electrical wiring to panels or subpanels
¿ Structural modifications
¿ Carpentry, drywall, or painting beyond what is required for access
6. WARRANTY & SERVICE The installation includes the following warranties:
¿ 5-Year Compressor Warranty
¿ 1-Year Parts Warranty
¿ 1-Year Labor Warranty
¿ Manufacturer warranties per product documentation
7. Equipment:
8. Green Ecofriendly Cleaning products, up to code refrigerant per EPA guidelines.
9. 7. Deliverables:
10. Provide product submittals for all equipment to be used
11. Provide project specific safety plan.
12. Provide one hard-bound copy of all warranty information.
13. 8. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION (GFP, GFM, GFE, OR GFI): N/A
14. 9. Safety:
15. This contractor is to follow at a minimum all OHSA rules and procedures. All Green products are recommended to continue all safety precautions to the environment. A required safety plan must be submitted and approved before any work is to begin. This plan shall identify any hazards related to the work and provide measures to follow to mitigate risk.
16. 10. Security: N/A
17. 11. Travel:
18. Contractor shall be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.
19. 12. Special Material Requirements: N/A
20. List any special material requirements or write N/A.
21. 13. Other Unique Requirements: N/A
22. 14. Quality Assurance Requirement:
23. The contractor shall develop and maintain a quality program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum, the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor¿s performance in accordance with the statement of work.
All new equipment must conform to the
24. manufacturer¿s instructions and guidelines for installation and start-up.
25. While performing work, the contractor shall comply with the latest applicable versions of the following:
26. International Family of Codes, primarily the IBC (International Building Code)
27. American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE) Standards and Guidelines
28. National Environmental Balancing Bureau (NEBB)
29. Associated Air Balance Council (AABC)
30. NFPA 101 (National Fire Protection Association's Life Safety Code)
31. Federal, State and Local Building Codes, Standards and Policies
32. Local codes only if required by utility companies for service connections.
33. National Electrical Code (NEC)
34. Occupational Safety and Health Administration (OSHA) requirements
35. Additional Requirements:
36. All affected areas must be restored to their original condition from before the work began. Any damages will be fixed and repaired at no cost to the government.
37. All new equipment must conform to the manufacturer¿s instructions and guidelines.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 14, 2026
Special notice
Due May 11, 2026 at 9:00 AM EDT. SAM.gov, notice e860c6e8a4914d9692531397092bb1a6
1 revisions on SAM
- May 14, 2026: publish, special notice
Points of contact
- Dingle, Edwardedward_dingle@nps.gov4045075747