Skip to content
  • 6,799 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought, total small business set-aside, first published as solicitation

OR-KLAMATH FALLS FWO-PHASE 5 CONSTRUCTION

140FC324R0008

US Fish and Wildlife Service, Fws, Construction A/E Team 3. Other Heavy and Civil Engineering Construction.

Response deadline

April 29, 2024 at 3:00 PM EDT

Closed 916 days ago. Posted April 8, 2024, first published April 8, 2024. Scheduled to archive June 3, 2024.

Get the next one like this from US Fish and Wildlife Service by email, the day it is posted.Find my opportunities

This one closed in 2024

132 like it are open now in other heavy and civil engineering construction

All 132 open in other heavy and civil engineering construction

Description

As published on SAM.gov.

Klamath Falls New Hatchery Phase 5 will add earthen lined aquaculture ponds to the site to increase the capabilities of the sucker fish hatchery. This phase of the project includes a 0.30 acre earthen, lined pond for water storage known as the Head Pond, and up to three earthen, lined ponds for aquaculture with harvest kettle structures built into their berms, water supply, and drainage.

The aquaculture ponds will typically be 5 to 7 feet deep with berms that are 6 to 12 feet tall and vary in size from 1/12-acre to 1/2-acre. Supply pipelines, drainage pipelines and access roads will be constructed around each of the ponds. Phase 5 will also include re-routing of approximately 415 feet of 8-inch diameter geothermal supply (GS) pipeline.

Construction work needed to facilitate the project includes excavation, fill placement, grading, temporary erosion and sedimentation control, permanent seeding, pond liners, elevated bird predation netting system, cast-in-place concrete structures, paving and crushed rock road surfacing, pressurized pipelines for geothermal water distribution, and gravity pipelines for drainage. Through this sources sought, USFWS is also seeking industry feedback on the proposed design.

We are looking for industry recommended best practices that should be included in our design package and if there are any issues with the design that would present challenges to construction.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 8, 2024

    Solicitation, originally sources sought

    Due May 3, 2024 at 3:00 PM EDT. SAM.gov, notice 4ca03e1aef7c4df78bb63d27bcf67c80

  2. April 8, 2024

    Sources sought

    Due April 29, 2024 at 3:00 PM EDT. SAM.gov, notice 74d48bf7854c49d0b37d39c697e2c0df