Solicitation, total small business set-aside
VY-MISSISQUOI NWR-PARKING LOT MAINT
140FC226Q0036
US Fish and Wildlife Service, Fws, Construction A/E Team 2. Highway, Street, and Bridge Construction.
Response deadline
July 3, 2026 at 3:00 PM EDT
Closed 125 days ago. Posted June 10, 2026. Scheduled to archive July 18, 2026.
Get the next one like this from US Fish and Wildlife Service by email, the day it is posted.Find my opportunities
This one closed in 2026
35 like it are open now in highway, street, and bridge construction
- Jake Rocks Road Reconstruction
Forest Service, Usda-Fs, Csa Southwest 7
Combined synopsis and solicitationSmall businessNAICS 237310Warren, PA127EAX27Q0003Closes todayNov 5 - Repair Taxiway Pavements (Phase 3 and 4) Naval Air Station Oceana, Virginia
Department of the Navy, Navfacsyscom Mid-Atlantic
Sources soughtNAICS 237310Virginia Beach, VAN4008527R0016Closes todayNov 5 - Road Maintenance - Sheyenne. Roadway reconditioning and aggregate surface place and aggregate spot surfacing
Forest Service, USDA FS Dakota Prairie Grasslands
Combined synopsis and solicitationSmall businessNAICS 237310Lisbon, ND1240BE27Q0011Closes tomorrowNov 6
Description
As published on SAM.gov.
The Missisquoi NWR requires its visitor¿s center and staff parking lot asphalt surface to be maintained to prevent degradation and improve striping visibility.
The ~1.0 acre asphalt parking lot was created when the new refuge office and visitor's center was built in 2006. Maintenance was completed in 2019. Since then, cold winters with freeze-thaw conditions and regular wear and tear have created cracks in the asphalt surface and worn away the parking lot striping on the surface. To prevent continued degradation the refuge requires the asphalt to be sealed, cracks filled and striping reapplied.
The work to be completed will be to the ~1.0 acre visitor's center and refuge staff parking lot. The following work will be accomplished:
1. Clean and prepare the entire asphalt surface to be seal coated.
2. Crack fill any cracks as needed with hot rubberized crack filler.
3. Apply one coat of commercial grade asphalt sealer to the entire asphalt surface.
4. Re-stripe all paring areas to match existing layout.
5. Provide cones, sawhorses or other traffic management supplies to direct visitor's to separate parking area at refuge shop facility
And other requirements as defined by the attached Scope of Work.
Site Visit: June 23,2026, at 10:00 AM EDT. POC: Chris Whitaker, christopher_whitaker@fws.gov, or (802)868-4781
Questions Due: June 24, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov
Quotes Due: July 3, 2026 at 3:00 PM EDT, to Bill Koski, Contract Specialist, william_koski@ios.doi.gov
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Section_B.pdf569 KB, June 10, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 10, 2026
Solicitation
Due July 3, 2026 at 3:00 PM EDT. SAM.gov, notice ada0aef79690493fa360f1b81cfb6726
1 revisions on SAM
- June 10, 2026: publish, solicitation
Points of contact
- Koski, Williamwilliam_koski@ios.doi.gov