Solicitation
Large-Tier Electrical Construction IDIQ
1333ND26RNB190031
National Institute of Standards and Technology, Department of Commerce NIST. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
September 10, 2026 at 5:00 PM EDT
Closed 52 days ago. Posted September 8, 2026, first published August 26, 2026. Scheduled to archive September 25, 2026.
Get the next one like this from National Institute of Standards and Technology by email, the day it is posted.Find my opportunities
This one closed 52 days ago
38 like it are open now in electrical contractors and other wiring installation contractors
- Edwards AFB Holiday Light & Decor Installation
Department of the Air Force, FA9301 Aftc Pzio
Closes tomorrowNov 2 - Generator Inspection Service and Routine Maintenance -
Department of Veterans Affairs, 246-Network Contracting Office 6
SolicitationSDVOSBNAICS 238210Virginia36C24627Q0090Closes tomorrowNov 2 - 692-21-101 CON NRM Improve Site Lighting and Lighting Controls for Energy Efficiency
Department of Veterans Affairs, 260-Network Contract Office 20
PresolicitationSDVOSBNAICS 238210White City, OR36C26027R0026Closes in 2 daysNov 3
All 38 open in electrical contractors and other wiring installation contractors
Description
As published on SAM.gov.
The U.S. Department of Commerce, National Institute of Standards and Technology intends to competitively solicit offers on a full and open competition basis for large-tier construction services for the NIST campus in Gaithersburg, Maryland. This is a new requirement; there is no incumbent contractor.
The solicitation will result in one or more Indefinite-Delivery, Indefinite-Quantity (IDIQ) contracts that include a 5-year ordering period. During the term of the contract(s), the Government shall place orders totaling a minimum of $5,000. The amount of all orders shall not exceed $73,788,828 for all task orders among all awardees, combined.
The solicitation includes requirements for the first task order (TO) which will be awarded shortly after the IDIQ contract(s) are awarded. Representative requirements for TOs over the 5-year ordering period include demolition, installation, maintenance, modification, addition, troubleshooting, testing, and/or repair of the following:
- Electrical branch circuits from 120-volt single phase up to 208-volt three-phase, utilizing EMT, rigid conduit, and wiremold raceway systems
- 120/208, 277/480, 2,400, 4160, and 13,800-volt service.
- Medium voltage (13.8kV) electrical (spot network) distribution systems
- Transformers, network protectors, switchgear, switchboards, medium voltage switches, panelboards, motors and control centers, uninterruptible power supply (UPS), busways, generators, and various other electrical equipment and devices.
- Direct Digital Controls (DDC)
- Electrical faults and problems
- Interior and exterior lighting (120 V to 277 V), including re-lamping and ballast replacement
- Work from building plans, blueprints, wiring diagrams, engineering drawings, and electrical O&M manuals to plan and lay out the routing, placement type, size, gauge, balance, load, continuity, and safe operation of electrical lines, circuits, systems, equipment, and controls
- Life safety systems, to include Johnson Controls (formerly Simplex) fire alarms, mass notification, exhaust fan/fume hood interlock, gas monitoring, laser safety interlock systems, air aspirating systems, oxygen (O2) monitoring systems, carbon dioxide (CO2) release systems, and galley vent hood release systems.
- 13.8 kV exterior power distribution systems in concrete encased duct banks
- Medium and low voltage faults in underground distribution networks with manholes
- Low and medium-voltage cables and splices (PILC and EPR cable types)
The solicitation utilizes the advisory multistep process described in RFO FAR 15.101 paragraph (e). Only those offerors that submit a Phase 1 offer may participate in 2. See Section L of the solicitation for additional information.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 1333ND26RNB190031.pdf3.7 MB, August 26, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 26, 2026
Solicitation
Due September 10, 2026 at 5:00 PM EDT. SAM.gov, notice ef5cc07aa43f409889811b5f32a7eb33
4 revisions on SAM
- September 8, 2026: publish, solicitation
- September 2, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 26, 2026: publish, solicitation
August 28, 2026
Solicitation
Due September 10, 2026 at 5:00 PM EDT. SAM.gov, notice 9f083ffca1ba4ee8b8fcf7c431917c60
4 revisions on SAM
- September 8, 2026: publish, solicitation
- September 2, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 26, 2026: publish, solicitation
September 2, 2026
Solicitation
Due September 10, 2026 at 5:00 PM EDT. SAM.gov, notice 8aaa9e90b36b44469220f530d528f1ab
4 revisions on SAM
- September 8, 2026: publish, solicitation
- September 2, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 26, 2026: publish, solicitation
September 8, 2026
Solicitation
Due September 10, 2026 at 5:00 PM EDT. SAM.gov, notice 0cc10dd3fad647dcba0240d7ff90ba0d
4 revisions on SAM
- September 8, 2026: publish, solicitation
- September 2, 2026: publish, solicitation
- August 28, 2026: publish, solicitation
- August 26, 2026: publish, solicitation
Points of contact
- Travis Zoellner, Contracting Officertravis.zoellner@nist.gov
- Patricia Rosepatricia.rose@nist.gov3034973106