Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, women-owned small business set-aside

Site Effluent System

1333ND26RNB190022

National Institute of Standards and Technology, Department of Commerce NIST. Facilities Support Services.

Response deadline

August 7, 2026 at 12:00 PM EDT

Closed 86 days ago. Posted September 3, 2026, first published June 9, 2026. Scheduled to archive September 4, 2026.

Get the next one like this from National Institute of Standards and Technology by email, the day it is posted.Find my opportunities

This one closed in 2026

36 like it are open now in facilities support services

All 36 open in facilities support services

Description

As published on SAM.gov.

This solicitation is reissued due to technical responses that were required in addition to adhering to the FAR Overhaul under Commercial Services. A second site visit is scheduled and listed within the attached Amendment. 

BACKGROUND INFORMATION 

The Gaithersburg Site Effluent Treatment System is located on the south end of campus at the “E” Gate intersection at Center Drive. Built in the mid-1990’s, the system was designed to comply with Washington Sanitary Sewer Commission (WSSC) effluent discharge requirements. The system is centered around a large concrete tank (wet tank) that provides primary effluent treatment with a stir / chop agitator system PH monitoring and treatment.

Currently, the interior wet tank operational, structural, and life safety systems have rendered this system inoperable. Inspection has found the primary floor support has detached along the south side of the wet tank. This has caused for the aluminum grating to sag, and no longer safe for personnel entry. More, there are areas of the aluminum grate that have literally rotted away.

Further inspection revealed several issues.

Internal blowers to address the confined space ventilation requirements are inoperable and heavily corroded. The system internal heater is inoperable and heavily corroded. The motor and stir mechanism is seized. Additionally, the motor is electrically inoperable. The explosion proof electrical wiring and conduit is in very poor condition.

In general, the entire wet tank and systems needs to be renovated and brought back to operable condition. This requires a complete replacement of all tank components. This includes an entire new floor surface and all support members, safety blowers and heaters, new stir / agitation motor and shaft system, PH monitoring probes and data signaling, epoxy lining of the wet tank, lighting, electrical outlets, and demolition and replacement of all the explosion proof electrical wiring and conduit. Other work as required to conform to current regulatory requirements, as required.

PURPOSE

The Site Effluent Treatment System requires a complete rebuilding of all internal components to fulfill operational, regulatory, and life safety requirements.

PLACE OF PERFORMANCE

NIST Campus in Gaithersburg, Maryland.

NOTICE TO OFFERORS

Proposals are being requested in accordance to the submission requirements for Technical Approach, Schedule, and Price. Award will be made on the basis of the best value to the government 

PERIOD OF PERFORMANCE  

The period of performance for this project is estimated at 200 days from Notice to Proceed.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 9, 2026

    Combined synopsis and solicitation

    Due June 25, 2026 at 12:00 PM EDT. SAM.gov, notice 40a01a44c77c4ad3985046b75a4310ce

    8 revisions on SAM
    • September 3, 2026: publish, combined synopsis and solicitation
    • September 3, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 31, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • June 9, 2026: publish, combined synopsis and solicitation
  2. July 17, 2026

    Combined synopsis and solicitation

    Due August 4, 2026 at 12:00 PM EDT. SAM.gov, notice 514cd481504a48d78db60e8977449409

    8 revisions on SAM
    • September 3, 2026: publish, combined synopsis and solicitation
    • September 3, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 31, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • June 9, 2026: publish, combined synopsis and solicitation
  3. July 17, 2026

    Combined synopsis and solicitation

    Due August 4, 2026 at 12:00 PM EDT. SAM.gov, notice f53a898592be493ca01dbdcf034ed073

    8 revisions on SAM
    • September 3, 2026: publish, combined synopsis and solicitation
    • September 3, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 31, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • June 9, 2026: publish, combined synopsis and solicitation
  4. July 31, 2026

    Combined synopsis and solicitation

    Due August 4, 2026 at 12:00 PM EDT. SAM.gov, notice b03d135ebac74f2d81db9ec500353c4a

    8 revisions on SAM
    • September 3, 2026: publish, combined synopsis and solicitation
    • September 3, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 31, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • June 9, 2026: publish, combined synopsis and solicitation
  5. August 4, 2026

    Combined synopsis and solicitation

    Due August 7, 2026 at 12:00 PM EDT. SAM.gov, notice 9a7a312d60964360aa8ebc2fa77c13b6

    8 revisions on SAM
    • September 3, 2026: publish, combined synopsis and solicitation
    • September 3, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 31, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • June 9, 2026: publish, combined synopsis and solicitation
  6. August 4, 2026

    Combined synopsis and solicitation

    Due August 7, 2026 at 12:00 PM EDT. SAM.gov, notice fbaf1a2fca7a40fd8ee36d8b8a083114

    8 revisions on SAM
    • September 3, 2026: publish, combined synopsis and solicitation
    • September 3, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 31, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • June 9, 2026: publish, combined synopsis and solicitation
  7. September 3, 2026

    Combined synopsis and solicitation

    Due August 7, 2026 at 12:00 PM EDT. SAM.gov, notice f1db3bcb04eb400c8f9b140b718511ab

    8 revisions on SAM
    • September 3, 2026: publish, combined synopsis and solicitation
    • September 3, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 31, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • July 17, 2026: publish, combined synopsis and solicitation
    • June 9, 2026: publish, combined synopsis and solicitation

Points of contact