UPPER AIR (UA) BUILDING PAINTING & REPAIR

1305M324Q0157

National Oceanic and Atmospheric Administration, Department of Commerce NOAA. All Other Specialty Trade Contractors.

Awarded

Marval Group LLC

$19,530.00 obligated so far on USAspending

Description

As published on SAM.gov.

AMENDMENT 0004 April 24, 2024 Q&A: The upper air building is roughly 16'x 16’, 256 square feet.

AMENDMENT 0003 April 23, 2024 Q&A: We understand interior walls are to be sealed and painted per the SOW, and also understand that the joints / cracks and wall penetrations to be caulked, which will occur on the exterior side of the CMU walls. But is exterior of the CMU walls to be sealed with fluid-applied coatings / sealers?

ANSWER: yes, all concrete block walls both exterior and interior will be sealed and painted.

AMENDMENT 0002 April 23, 2024 Q&A:

Questions:

QUESTIONS:

Building: • Replace wooden fence enclosing Hydrogen Bottle storage area. Are only wooden components to be replaced, in that all metal posts, brackets, etc. remain?

ANSWER: The metal posts nor metal I-beams don't need to be replaced. only the wooden fence to be replaced. Is wooden fencing to be replaced in-kind / similar to existing?

ANSWER: Yes, replaced with the same type of wooden fencing. Replace metal roof panels covering Hydrogen Bottle area. Are only metal roof panels to be removed and replaced?

ANSWER: Yes, replaced with 26-gauge metal roof panels. Are roof structure supports to remain?

ANSWER: Yes. Are metal panels to be replaced in-kind / similar to existing?

ANSWER: Yes, replaced with 26-gauge metal roof panels.

QUESTIONS:

Metal: • Treat all rust on metal parts with a rust inhibitor to prepare for painting.

ANSWER: YES - Remove and replace metal that is not salvageable.

ANSWER: YES • Prime and paint all new metal parts.

ANSWER: YES In addition to new metal parts – if and where required – is Contractor to paint all existing metal parts?

ANSWER: YES Can we assume that both primer and paint finish are required on existing metal parts?

ANSWER: YES, as per SOW. Is the hyperbolic dome to be primed and painted?

ANSWER: NO, it's not in SOW nor does it apply to this project. In addition to painting metal – Is the low-sloped / flat roof concrete apron at base of dome to be cleaned and re-sealed with elastomeric roof coating?

ANSWER:

NO QUESTIONS:

Hand Rail: • Prepare hand rail for re-painting.

ANSWER: YES, as per SOW. Does preparation include abrasive grinding and sanding?

ANSWER: No, grinding is not necessary, light sanding will be required.

QUESTIONS:

Block Walls: • Apply masonry sealer to block walls.

ANSWER: YES, as per SOW. Masonry sealer specified is:

Sherwin Williams Loxon Masonry Coating (Clear), but this material is manufactured and specified to be applied directly to bare concrete and masonry. The existing walls are paint-coated and material compatibility and adhesion may become an issue. Normally, industry standards recommend an oil-based primer to paint-coated walls, followed by an elastomeric paint finish. Please advise.

ANSWER: the interior walls are not painted at the current time, as per SOW seal and paint. Nonpersonal turnkey services. The National Weather Service (NWS), Weather Forecast Office (WFO) Tampa located at WFO Tampa, 2525 14TH AVE SE, Ruskin, Florida 33570-5468 require repair and repainting of the Upper Air Inflation Building (UAIB), Hydrogen Tank Enclosure in accordance to the statement of work (SOW).

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
XTYHQ4N3JCU5
CAGE
9PJ93
Vendor location
Rolling Meadows, IL
Contract
1305M324P0195, purchase order
Obligated
$19,530.00
Actions
1 between May 21, 2024 and May 21, 2024
Competition
Competed Under SAP, 15 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Nonpersonal Turnkey Services. the National Weather Service (Nws), Weather Forecast Office (Wfo) Tampa Located at Wfo Tampa, 2525 14TH Ave. Se, Ruskin, Florida 33570-5468 Require Repair and Repainting of the Upper Air Inflation Building (Uaib), Hydrog
Match
solicitation number 1305M324Q0157 equals the FPDS solicitation identifier; same awarding office 1305M3 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 10, 2024

    Combined synopsis and solicitation

    Due May 10, 2024 at 12:00 PM EDT. SAM.gov, notice 2710d5ff0bdf4108a9686a862b7f3b1c

  2. April 23, 2024

    Combined synopsis and solicitation

    Due May 10, 2024 at 12:00 PM EDT. SAM.gov, notice 1ec8e91d28964bb7bd59fe4d1c6237e3

  3. April 23, 2024

    Combined synopsis and solicitation

    Due May 10, 2024 at 12:00 PM EDT. SAM.gov, notice 8b03512551ac42ada141d2c6643440ec

  4. April 23, 2024

    Combined synopsis and solicitation

    Due May 10, 2024 at 12:00 PM EDT. SAM.gov, notice ec5a9c23bc0b441f953c594e61460062

  5. April 24, 2024

    Combined synopsis and solicitation

    Due May 10, 2024 at 12:00 PM EDT. SAM.gov, notice 0821a12d4f0b4aef866a356c41826436

Points of contact