Combined synopsis and solicitation, total small business set-aside
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
12FPC326B0012
Farm Production and Conservation Business Center, Fpac Bus Cntr-Acq Div. Other Heavy and Civil Engineering Construction.
Response deadline
June 25, 2026 at 1:00 PM EDT
Closed 83 days ago. Posted June 25, 2026. Scheduled to archive July 10, 2026.
Description
As published on SAM.gov.
Please see Tyler Dam Addendum No. 1 in the attachments/links section for further details and updates. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include:
excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 25, 2026
Combined synopsis and solicitation
Due June 25, 2026 at 1:00 PM EDT. SAM.gov, notice 01d055d827c84725aa1e9d3a9e130aea
Points of contact
- Mark Domingomark.domingo@usda.gov
Also open from this buyer
- Long-Term Seed Storage: Climate Controlled Walk-In CoolerCombined synopsis and solicitationSmall businessNAICS 333415Hawaii12FPC326Q0054Closes todaySep 16
- Portable Mainline Inspection System (Pipe Cameras)Combined synopsis and solicitationSmall businessNAICS 33399812FPC126Q0040Closes todaySep 16
- Janitorial Services - Kenton Service Center, Hardin County, OHCombined synopsis and solicitationSmall businessNAICS 561720Ohio12FPC426Q0074Closes todaySep 16
- USDA NRCS Puerto Rico Moving Relocation Services_Post-Closing Amendment 0002Combined synopsis and solicitationSmall businessNAICS 484210Puerto Rico12FPC426Q0062Closes todaySep 16
- Desiccant Dehumidifier System Replacement Project Plant Material Center, Tucson, AZCombined synopsis and solicitationSmall businessNAICS 238220Arizona12FPC322Q0049Closes todaySep 16