Award notice, total small business set-aside, first published as combined synopsis and solicitation
Tyler Dam Rehabilitation
12FPC326B0012
Farm Production and Conservation Business Center, Fpac Bus Cntr-Acq Div. Other Heavy and Civil Engineering Construction.
Awarded
$1,323,600.00 obligated so far on USAspending
Get the next one like this from Farm Production and Conservation Business Center by email, the day it is posted.Find my opportunities
This one was awarded in 2026
132 like it are open now in other heavy and civil engineering construction
- Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Department of the Army, W2SD Endist New England
Sources soughtNAICS 237990Concord, MAW912WJ27X1CUPCloses in 33 daysDec 3 - GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes in 2 daysNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes in 2 daysNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov with the combined synopsis and solicitation of June 25, 2026.
Please see Tyler Dam Addendum No. 1 in the attachments/links section for further details and updates.
Tyler Dam Rehabilitation Worchester County, MA
Site Showing on:
Wednesday, May 27ᵗʰ at 10:00 AM at the site
200 Robin Hill Street
Marlborough, MA 01752
The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream
of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street
intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 3 - WD MA20250006 1-30-2026.pdf54 KB, May 19, 2026
- IFB - 12FPC326B0012 Combined Synopsis.pdf461 KB, May 19, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Lucianos Excavation Inc.
- UEI
- KMKAHKFB79M3
- CAGE
- 6NNB5
- Vendor location
- Taunton, MA
- Contract
- 12FPC326C0009, definitive contract
- Obligated
- $1,323,600.00
- Actions
- 1 between September 21, 2026 and September 21, 2026
- Competition
- Competed Under SAP, 4 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Dam Rehabilitation - Construction; Tyler Dam
- Match
- solicitation number 12FPC326B0012 equals the FPDS solicitation identifier; same sub-agency 12D0 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 19, 2026
Combined synopsis and solicitation
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Due June 19, 2026 at 1:00 PM EDT. SAM.gov, notice 765d4d1f291247d3be06016751e4b1d1
5 revisions on SAM
- June 25, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- May 20, 2026: publish, combined synopsis and solicitation
- May 19, 2026: publish, combined synopsis and solicitation
May 20, 2026
Combined synopsis and solicitation
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Due June 18, 2026 at 1:00 PM EDT. SAM.gov, notice 8eb83b2ee91b4b8b997bba01f3437005
5 revisions on SAM
- June 25, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- May 20, 2026: publish, combined synopsis and solicitation
- May 19, 2026: publish, combined synopsis and solicitation
June 11, 2026
Combined synopsis and solicitation
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Due June 25, 2026 at 1:00 PM EDT. SAM.gov, notice 007f0ef1aa00414482600c2a9436503f
5 revisions on SAM
- June 25, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- May 20, 2026: publish, combined synopsis and solicitation
- May 19, 2026: publish, combined synopsis and solicitation
June 11, 2026
Combined synopsis and solicitation
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Due June 25, 2026 at 1:00 PM EDT. SAM.gov, notice 58f98c934ea44c4fb89961ebfbcf6b54
5 revisions on SAM
- June 25, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- May 20, 2026: publish, combined synopsis and solicitation
- May 19, 2026: publish, combined synopsis and solicitation
June 25, 2026
Combined synopsis and solicitation
NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam
Due June 25, 2026 at 1:00 PM EDT. SAM.gov, notice 01d055d827c84725aa1e9d3a9e130aea
5 revisions on SAM
- June 25, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- June 11, 2026: publish, combined synopsis and solicitation
- May 20, 2026: publish, combined synopsis and solicitation
- May 19, 2026: publish, combined synopsis and solicitation
October 5, 2026
Award notice
Awarded to Lucianos Excavation Inc. for $1,323,600. SAM.gov, notice 1cccbad7c64b464fa3554f28d27c8734
1 revisions on SAM
- October 5, 2026: publish, award notice
Points of contact
- Mark Domingomark.domingo@usda.gov