Skip to content
  • 6,946 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

USDA-NRCS-TX - Hickory Creek Watershed Site 11 & 14 Repairs in Denton County

12FPC325B0006

Farm Production and Conservation Business Center, Fpac Bus Cntr-Acq Div. Other Heavy and Civil Engineering Construction.

Awarded

Mann Robinson & Son Inc.

$985,360.50 obligated so far on USAspending

Get the next one like this from Farm Production and Conservation Business Center by email, the day it is posted.Find my opportunities

This one was awarded in 2025

132 like it are open now in other heavy and civil engineering construction

All 132 open in other heavy and civil engineering construction

Description

As published on SAM.gov.

Please see attachment combined synoposis solicitation and Statement of Works (SOW) for further detials.

This solicitation is a Total Small Business Set-Aside.
A firm fixed price construction contract is anticipated to be awarded under Sealed Bidding in FAR 
Part 14.

Site Visit is scheduled for 8/13/2025 at 10:00AM meeting at:
525 S. Loop 288 Suite C-1
Denton, TX 76205


A bid guarantee shall be 20% of the bid price or $3 Million, whichever is less.

The estimated magnitude of the project is between $1,250,000 and $1,750,000

*Site work will be completed one at a time, finish one site requried work then will move on to the other site to begin work.

The upstream wave berm repair of Site 11 will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and reconstructing the fence above the rock riprap.

The upstream wave berm repair of Site 14 will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and reconstructing the fence above the rock riprap.

The existing, constructed plunge basin has experienced erosion along the side slopes of the basin and outlet channel. To prevent/retard future erosion, the basin will be armored with a 2 feet thick blanket of rock riprap.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
D6BPZ47GM778
CAGE
457K3
Vendor location
Aubrey, TX
Contract
12FPC325C0012, definitive contract
Obligated
$985,360.50
Actions
2 between September 24, 2025 and June 11, 2026
Competition
Full and Open Competition, 11 offers received
Set-aside reported
No Set Aside Used.
Described as
Hickory Creek Watershed Site 11 & 14 Repairs - Denton, County, TX Nrcs-Tx
Match
solicitation number 12FPC325B0006 equals the FPDS solicitation identifier; same sub-agency 12D0 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 5, 2025

    Combined synopsis and solicitation

    Due August 26, 2025 at 1:00 PM EDT. SAM.gov, notice 0d39708047754981a96834225a12fd90

  2. August 8, 2025

    Combined synopsis and solicitation

    Due August 26, 2025 at 1:00 PM EDT. SAM.gov, notice a5bd256c7ce54f95be40765fcdfcfc55

  3. August 12, 2025

    Combined synopsis and solicitation

    Due August 26, 2025 at 1:00 PM EDT. SAM.gov, notice e6287e66e4434dbeaf0a638f83c2b6f5

  4. August 14, 2025

    Combined synopsis and solicitation

    Due August 26, 2025 at 1:00 PM EDT. SAM.gov, notice 10f3f7a27db34b7395be6e67e8cc5a73

  5. August 14, 2025

    Combined synopsis and solicitation

    Due August 26, 2025 at 1:00 PM EDT. SAM.gov, notice 6b124e9f20d8412f8d699c1826b19d77

  6. August 22, 2025

    Combined synopsis and solicitation

    Due August 26, 2025 at 1:00 PM EDT. SAM.gov, notice 0580ff1dfab848ebb9bc43afb0d9c446

  7. August 26, 2025

    Combined synopsis and solicitation

    Due August 27, 2025 at 1:00 PM EDT. SAM.gov, notice 2e4ec6b71e344884b1550bddcac575db

    7 revisions on SAM
    • August 26, 2025: publish, combined synopsis and solicitation
    • August 22, 2025: publish, combined synopsis and solicitation
    • August 14, 2025: publish, combined synopsis and solicitation
    • August 14, 2025: publish, combined synopsis and solicitation
    • August 12, 2025: publish, combined synopsis and solicitation
    • August 8, 2025: publish, combined synopsis and solicitation
    • August 5, 2025: publish, combined synopsis and solicitation

Points of contact