Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

GREAT ONYX JC KENTUCKY LAGOON AERATION IMPROVEMENTS

12970224Q0007

Forest Service, USDA Forest Service-Spoc SW. Water and Sewer Line and Related Structures Construction.

Response deadline

March 13, 2024 at 1:00 PM EDT

Closed 918 days ago. Posted February 29, 2024, first published February 21, 2024. Scheduled to archive March 28, 2024.

Description

As published on SAM.gov.

Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:

1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnects.

2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits.

3. Furnish and install microbubble lagoon aeration system consisting of the following:

a. Control panel with individual motor overload protection circuit breakers.

b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each).

4. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure.

5. Furnish third-party inspection of electrical work included in this contract. The project Schedule of Items includes a section to organize the work into Base Items.

1. Provide pricing for all items listed in the Schedule of Items.

2. Contract award will be made for all Base Items.

3. Optional Items may or may not be awarded, depending on fund availability. Base Items 1. Base Item No. 0001 – Lagoon Aeration a. Measurement: This item is measured as a Lump Sum quantity.

2. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to:

a. Furnish and install 480V, 3 PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits.

b. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits.

c. Furnish and install microbubble lagoon aeration system consisting of the following:

1. Control panel with individual motor overload protection circuit breakers.

2. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each) d. Locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure. e. Furnish third-party inspection of electrical work included in this contract.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 21, 2024

    Combined synopsis and solicitation

    Due March 13, 2024 at 1:00 PM EDT. SAM.gov, notice a289dca877414169a3ad14c1502c5f3c

  2. February 28, 2024

    Combined synopsis and solicitation

    Due March 13, 2024 at 1:00 PM EDT. SAM.gov, notice d0fe2ad204414cd7aa541db067dbf4ac

  3. February 29, 2024

    Combined synopsis and solicitation

    Due March 13, 2024 at 1:00 PM EDT. SAM.gov, notice 404b2814d3fe4736885e8c8cd989e025

Points of contact