Skip to content
Abierto

Solicitation, total small business set-aside

Buffalo Creek Bunkhouse Lift Station Repairs

1282B125Q0008

Forest Service, USDA Forest Service-Spoc Im. Water Supply and Irrigation Systems.

Response deadline

January 13, 2025 at 5:00 PM EST

Closed 613 days ago. Posted January 3, 2025, first published December 10, 2024. Scheduled to archive January 28, 2025.

Description

As published on SAM.gov.

NEW INFORMAITON PERTAINING TO THE STATEMENT OF WORK HAS BEEN INCLUDED IN THE DOCUMENTS SECTION AND THE SOLICITATION PERIOD HAS BEEN EXTENDED UNTIL 01/13/2024. Work for this project includes supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary licenses and permits for the following:

1. Removing existing lift station pumps, plumbing and miscellaneous equipment not required for lift station operation and as directed by the CO.

2. Providing and installing duplex grinder pumps and rail lift system.

3. Work also includes connection of the pump discharge piping to the existing lift station outlet, including a new check valve and ball valve on each pump outlet.

4. Miscellaneous work includes but is not limited to:

pumping out the lift station basin, disconnect/connect electrical supply, and mounting equipment to the basin as required by the manufacturer.

5. All cleanup work is included and considered incidental to the other work items.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. December 10, 2024

    Solicitation

    Due December 20, 2024 at 5:00 PM EST. SAM.gov, notice 84555cf303564d3781fcd43ce7efa115

  2. December 20, 2024

    Solicitation

    Due December 30, 2024 at 5:00 PM EST. SAM.gov, notice d4a13ee8164f41a381b9e01ddbbc87c5

  3. January 3, 2025

    Solicitation

    Due January 13, 2025 at 5:00 PM EST. SAM.gov, notice f923642658da478aa7cb50c21297c2cb

Points of contact