Skip to content
  • 6,811 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, total small business set-aside

LOWER BOOTH RIPRAP

1282B124Q0107

Forest Service, USDA Forest Service-Spoc Im. Highway, Street, and Bridge Construction.

Response deadline

September 3, 2024 at 5:00 PM EDT

Closed 789 days ago. Posted August 21, 2024. Scheduled to archive September 18, 2024.

Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities

This one closed in 2024

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Description

As published on SAM.gov.

This contract is for the furnishing, hauling and placement of South Dakota Class B riprap at four (4) designated locations on and near the dam as described in the Specifications and shown on the Drawings. Before the riprap is to be placed, minor excavation of the identified streambed and head-cut areas described in the Specifications and shown on the Drawings will occur and drainage fabric will be placed according to the Specifications and shown on the Drawings.

Additional South Dakota Class B riprap will be stockpiled at a location designated by the Government. After all ground disturbance activities have been completed, seeding and the placement of erosion control materials as described in the Specifications and shown on the Drawings will be the responsibility of the contractor. Work for the Lower Booth Dam Riprap project consists of the following:

Furnish, haul, and place South Dakota Class B ripap at four (4) designated locations on and near the dam as described in the Specifications and Shown on the Drawings. Furnish and place Type B Drainage Fabric under the riprap as described in the Specifications and Shown on the Drawings. Additional South Dakota Class B riprap will be stockpiled at a location designated by the Government. Excavate the streambed and head-cut areas as described in the Specifications and Shown on the Drawings. Seed and place erosion control materials at locations as described in the Specifications.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 21, 2024

    Solicitation, originally presolicitation

    Due September 3, 2024 at 5:00 PM EDT. SAM.gov, notice 97ab02f26348423aa71a92fd97f0e605

Points of contact