Award notice, total small business set-aside, first published as presolicitation
Trail Hardening MUT, Lake Loop Section
127EAV26R0010
Forest Service, Southwestern Regional Office, Region 3. Other Heavy and Civil Engineering Construction.
Awarded
Turner, Ramirez and Associates, Inc.
$853,352.94 obligated so far on USAspending
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one was awarded in 2026
132 like it are open now in other heavy and civil engineering construction
- Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Department of the Army, W076 Endist Galveston
SolicitationNAICS 237990Galveston, TXW912HY26BA019Closes in 3 daysNov 3 - FY27 Texas City Ship Channel Main Channel and Turning Basin
Department of the Army, W076 Endist Galveston
Sources soughtNAICS 237990Galveston, TXW912HY27X1CT1Closes in 7 daysNov 7 - FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING
Department of the Army, W076 Endist Galveston
SolicitationNAICS 237990TexasW912HY26BA018Closes in 10 daysNov 10
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov with the solicitation of April 14, 2026.
April 14, 2026
Amendment 127EAV26R0010 P00001
The purpose of this amendment is to extend the solicitation from April 17, 2026 15:00 MT to May 8, 2026 12:00 PM PST.
__________________________________________________________________
1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and
supervision to complete the project.
2. The contractor shall be responsible to verify the necessary quantities of materials to be
supplied. It is suggested that the contractor visit the project site prior to turning in a
proposal.
3. There are no utilities available at the project site.
4. All work shall be done in accordance with this document, the project plans, and the FP-
14.
5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to
be incorporated into the work shall be removed daily.
1. Disclosure of the Magnitude of Construction (FAR 36.204)
In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.
This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.
2. Site Visit
Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.
Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.
3. Period of Performance
The contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.
The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.
4. Bonding Requirements
In accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.
The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.
5. Differing Site Conditions
Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
QUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 127EAV26R0010 Trail Hardening MUT Lake Loop Section 3.16.pdf1.2 MB, March 16, 2026
- Presolicitation Notice 127EAV26R0010 2.8.26.pdf174 KB, February 9, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Turner, Ramirez and Associates, Inc.
- UEI
- MK1FBNRMQME5
- CAGE
- 57UQ9
- Vendor location
- Corpus Christi, TX
- Contract
- 127EAV26C0007, definitive contract
- Obligated
- $853,352.94
- Actions
- 1 between August 11, 2026 and August 11, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 9 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Perform Drainage Structure and Surfacing Repairs for the Entire Length of the Lake Loop of the Multiple Use Trail
- Match
- award number 127EAV26C0007 equals the contract number; same sub-agency 12C2 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 9, 2026
Presolicitation
Sam Houston Trail Bridge Replacement
Due February 23, 2026 at 2:00 PM EST. SAM.gov, notice 835af6cdc73f4978ad41740fe79077e6
2 revisions on SAM
- February 9, 2026: publish, presolicitation
- February 9, 2026: publish, presolicitation
February 9, 2026
Presolicitation
Sam Houston Trail Bridge Replacement
Due February 23, 2026 at 2:00 PM EST. SAM.gov, notice fcef42a391894435a84ba68e941d5024
2 revisions on SAM
- February 9, 2026: publish, presolicitation
- February 9, 2026: publish, presolicitation
March 17, 2026
Solicitation
Due April 17, 2026 at 5:00 PM EDT. SAM.gov, notice 4e70fcd5345f40bdbf3d4ec70acd3715
4 revisions on SAM
- April 14, 2026: publish, solicitation
- March 17, 2026: publish, solicitation
- March 17, 2026: publish, solicitation
- March 16, 2026: publish, solicitation
March 17, 2026
Solicitation
Due April 17, 2026 at 5:00 PM EDT. SAM.gov, notice 89552b2ef2a2401f94623ee7a496cf56
4 revisions on SAM
- April 14, 2026: publish, solicitation
- March 17, 2026: publish, solicitation
- March 17, 2026: publish, solicitation
- March 16, 2026: publish, solicitation
March 16, 2026
Solicitation
Due April 17, 2026 at 5:00 PM EDT. SAM.gov, notice 9c3959e4511a4657a046080c495ca7d7
4 revisions on SAM
- April 14, 2026: publish, solicitation
- March 17, 2026: publish, solicitation
- March 17, 2026: publish, solicitation
- March 16, 2026: publish, solicitation
April 14, 2026
Solicitation
Due May 8, 2026 at 3:00 PM EDT. SAM.gov, notice 7c466f7348d54bedaec484073aa1333f
5 revisions on SAM
- August 15, 2026: publish, award notice
- April 14, 2026: publish, solicitation
- March 17, 2026: publish, solicitation
- March 17, 2026: publish, solicitation
- March 16, 2026: publish, solicitation
August 15, 2026
Award notice, originally solicitation
Awarded to Turner, Ramirez and Associates, Inc. for $853,353. SAM.gov, notice 05bc7d1e96e040879cfbce10e295839e
2 revisions on SAM
- August 15, 2026: publish, award notice
- April 14, 2026: publish, solicitation
Points of contact
- DAVID WATSONDAVID.L.WATSON@USDA.GOV4802049319