Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Award notice, total small business set-aside, first published as presolicitation

Sam Houston Trail Bridge Replacement

127EAV26R0009

Forest Service, Southwestern Regional Office, Region 3. Highway, Street, and Bridge Construction.

Awarded

Hydra Engineering & Construction, LLC

$3,680,000.00 obligated so far on USAspending

Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities

This one was awarded in 2026

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Description

As published on SAM.gov with the solicitation of May 9, 2026.

April 10, 2026

The purpose of this amendment is to:
1.Update and provide responses to questions.
2. Extend solicitation from April 17, 2026, to May 29, 2026, 1400 CST.

1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals 
necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX.  Work includes: 
1.1.1 Phase A: Site Investigation and Analysis 
1.1.2 Phase B: Design and Construction Document Preparation 
1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, 
and construction and connecting of trail approaches from the existing trail to the new crossings. 
1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.  

1. Disclosure of the Magnitude of Construction (FAR 36.204)
In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1,000,000 and $5,000,000.
This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.
2. Site Visit
Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.
Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.
3. Period of Performance
The contractor shall complete all work required under this contract within 390 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.
The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.
4. Bonding Requirements
In accordance with FAR 52.228-15, Performance and Payment Bonds Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.
The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.
5. Differing Site Conditions
Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
HVA8QVX8YST1
CAGE
514K1
Vendor location
Crawfordville, FL
Contract
127EAV26C0008, definitive contract
Obligated
$3,680,000.00
Actions
1 between August 8, 2026 and August 8, 2026
Competition
Full and Open Competition After Exclusion of Sources, 8 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
This Is a Design Build Contract for Trail Bridges Across the Sam Houston National Forest. 1.1 This Project Includes All Labor, Materials, Equipment, Supplies, Travel, Supervision, and Incidentals Necessary for the Full Design and Construction of (18
Match
award number 127EAV26C0008 equals the contract number; same sub-agency 12C2 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 9, 2026

    Presolicitation

    Sam Houston Trail Hardening MUT, Lake Loop Section

    Due February 23, 2026 at 2:00 PM EST. SAM.gov, notice 708807954c7a4da7b32bc9a6a7c0b499

    1 revisions on SAM
    • February 9, 2026: publish, presolicitation
  2. March 17, 2026

    Solicitation

    Due April 17, 2026 at 4:00 PM EDT. SAM.gov, notice faeb1ae62a44484fb26cf8d8122e42ac

    5 revisions on SAM
    • May 9, 2026: publish, solicitation
    • April 10, 2026: publish, solicitation
    • March 26, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
  3. March 17, 2026

    Solicitation

    Due April 17, 2026 at 4:00 PM EDT. SAM.gov, notice b52c5903be994196bd9231d6d116f647

    5 revisions on SAM
    • May 9, 2026: publish, solicitation
    • April 10, 2026: publish, solicitation
    • March 26, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
  4. March 26, 2026

    Solicitation

    Due April 17, 2026 at 4:00 PM EDT. SAM.gov, notice 1e59a76cda1d4ba288d1afdb3b611a18

    5 revisions on SAM
    • May 9, 2026: publish, solicitation
    • April 10, 2026: publish, solicitation
    • March 26, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
  5. April 10, 2026

    Solicitation

    Due May 29, 2026 at 3:00 PM EDT. SAM.gov, notice 0b3e3a96cd9a41b297e5ff3da9ad13e2

    5 revisions on SAM
    • May 9, 2026: publish, solicitation
    • April 10, 2026: publish, solicitation
    • March 26, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
  6. May 9, 2026

    Solicitation

    Due May 29, 2026 at 3:00 PM EDT. SAM.gov, notice 2408996782a6472e82945cb318d38c0a

    6 revisions on SAM
    • August 13, 2026: publish, award notice
    • May 9, 2026: publish, solicitation
    • April 10, 2026: publish, solicitation
    • March 26, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
    • March 17, 2026: publish, solicitation
  7. August 13, 2026

    Award notice, originally solicitation

    Awarded to Hydra Engineering & Construction, LLC for $3,680,000. SAM.gov, notice fc4b201afe7c492a9476f40558e1b445

    2 revisions on SAM
    • August 13, 2026: publish, award notice
    • May 9, 2026: publish, solicitation

Points of contact