Combined synopsis and solicitation, total small business set-aside
Monongahela NF FR78 Dogway Bridge Replacement
12445526Q0104
Forest Service, Usda-Fs, Csa East 13. Highway, Street, and Bridge Construction.
Response deadline
August 9, 2026 at 2:00 PM EDT
Closed 38 days ago. Posted August 28, 2026, first published July 21, 2026. Scheduled to archive August 24, 2026.
Description
As published on SAM.gov.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 124455260104 is issued as a Request for Quotation (RFQ) for Monongahela NF FR78 Dogway Bridge Replacement; The contract removes three (3) existing vented ford low water crossings over Dogway Fork located on FR 78 with new single span structures. The new structures at MP 0.39 - Lower Dogway Bridge, MP 1.11 - Dogway Bridge, and MP 1.6 - Upper Dogway Bridges include concrete abutments, timber decks, and new gravel approaches. In stream work and dewatering is required for all bridges.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Webster County, WV AMENDMENT 0001: Adds an ORGANIZED SITE VISIT and adjusts due dates as follows:
SITE VISIT Location: Meet at Cranberry Mountain Nature Center, Intersection of Rt 39/55 and, WV-150, Hillsboro, WV 24946 Date:
Wednesday 12 August 2026 Time: 11 a.m. Eastern Latitude:
38.183539 Longitude: -80.252786 Directions: Located at the junction Route 150 and Route 39/55, 16 miles from Marlinton and 22 miles from Richwood. QUESTIONS ALL Questions shall be submitted IN WRITING via email to debra.brinn@usda.gov and CC to chad.h.arbogast@usda.gov ALL QUESTIONS are due no later than August 24, 2026, at 2:00 PM Eastern Time. REMINDER that 52.236-3 Site Investigation and Conditions Affecting the Work is in effect.
Site visits are not mandatory however if there are things that could have known or should have been known by inspecting the site, they will not be considered differing site conditions in the event that they are not accounted for in a quote. Quotes are now due 2 pm Eastern on 31 August 2026.
Amendment 0002: The purpose of this amendment is to extend the due date to Wednesday 9 September at 1400 eastern. The following documents are hereby incorporated: 260827 Questions and Answers FR 78 Dogway Bridges Project SIGN IN SHEET FR 78 DOGWAY BRIDGES PROJECT (from site visit) Dogway MP 0.39 Existing Structure Dogway MP 1.11 existing structure 1 Dogway MP 1.11 existing structure 2 dogway mp 1.60 existing structure 1 dogway mp 1.60 existing structure 2 Questions will no longer be accepted.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 21, 2026
Combined synopsis and solicitation
Due August 25, 2026 at 2:00 PM EDT. SAM.gov, notice 45a59d3890284d20ac9a33c4466dff23
August 5, 2026
Combined synopsis and solicitation
Due August 31, 2026 at 2:00 PM EDT. SAM.gov, notice ed05dcaccc004824b67693be44db5ff0
August 28, 2026
Combined synopsis and solicitation
Due September 9, 2026 at 2:00 PM EDT. SAM.gov, notice 3b0985ac79604edd8b2e87c6cf0d3520
August 28, 2026
Combined synopsis and solicitation
Due August 9, 2026 at 2:00 PM EDT. SAM.gov, notice b30ab2d9cd404ebfafc23e6127e18f91
Points of contact
- BRINN, DEBRA Kdebra.brinn@usda.gov
Also open from this buyer
- CPF SO Quonset SecuritySolicitationSmall businessNAICS 238210Minnesota12445526Q0134Closes tomorrowSep 17