Solicitation, total small business set-aside
GAOA Monongahela Tea Creek Campground Bridge Replacement
12445525R0018
Forest Service, Usda-Fs, Csa East 13. Highway, Street, and Bridge Construction.
Response deadline
October 23, 2025 at 2:00 PM EDT
Closed 330 days ago. Posted January 20, 2026, first published September 23, 2025. Scheduled to archive November 7, 2025.
Description
As published on SAM.gov.
This solicitation is to provide construction services for furnishing and installing one two span box beam bridge system on FR 135 Tea Creek Campground Bridge Replacement.
The work shall include, but not be limited to, construction survey and staking, E&S, clearing and grubbing, installation of cofferdams and dewatering the site, excavation for placement of riprap, removal of existing structure, installation of bridge structure, micro piling design and installation, roadway subbase and aggregate, asphalt cement, guardrail, and riprap armoring.
Other construction activities to be expected are turbidity monitoring, in-channel Perimeter Control – Fish Relocation fish removal, candy darter monitoring and capturing, and stream rehabilitation. Work to be performed in accordance with attached specs, drawings and other defining documentation. Previously advertised under pre-solicitation 12445525R0004 but has new solicitation number 12445525R0018
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- BRINN, DEBRA Kdebra.brinn@usda.gov