Skip to content
Abierto

Solicitation, total small business set-aside

GAOA HMF Historic Iargo Springs Stair and Boardwalk Renovation

12445524R0003

Forest Service, Usda-Fs, Csa East 13. Other Heavy and Civil Engineering Construction.

Response deadline

March 7, 2024 at 2:00 PM EST

Closed 924 days ago. Posted June 28, 2024, first published January 12, 2024. Scheduled to archive March 22, 2024.

Description

As published on SAM.gov.

AMENDMENT 0003 incorporates Questions and Answers as of 2/29/2024. No extension. AMENDMENT 0002 extended due date. Now closes 3/7/2024 by 2 pm Eastern also changed performance period and adds groud work restrictions Q&A posted as of 2/15/2024 AMENDMENT 0001 extended due date. Now closes 2/22/2024 by 2 pm Eastern This project consists of site improvements to the Iargo Springs Interpretive Site. The existing vault toilet buildings will be removed and replaced.

The existing information kiosk will be removed and replaced with new interpretive signage panels. The existing wood stair, from the upper parking area to the lower boardwalk, will be removed and replaced. The upper observation overlook decking will be removed and replaced. Select areas of the lower boardwalk will also be removed and replaced with at grade pathways, and new elevated boardwalk loops will be constructed across Cooke Dam Pond.

The period of performance of this project is through September 27, 2024. UPDATED via Amendment 0001: All clearing and associated tree removal items must be completed before March 29, 2024.or after July 15, 2024 Project is located in Iosco County, Michigan. Driving directions are as follows:

From the Huron Shores Ranger Station, travel southeast on south Cedar Street for a few hundred feet. Turn left onto F41 and continue northwest for 3.1 miles. Turn left onto Rea Road, and then turn right after 3.1 miles, where Rea Road turns into Bissonette Road to continue on Rea Road for another 1.8 miles. Turn right onto East River Road, and continue west for 12.2 miles to reach the parking lot for Iargo Springs, on the north side of River Road, adjacent to Cooke Dam Pond. GPS 44.44218755762312, -83.67407977781525

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 12, 2024

    Solicitation, originally presolicitation

    Due February 13, 2024 at 2:00 PM EST. SAM.gov, notice c0815f5e276c470cb166734ab94dba1c

  2. February 9, 2024

    Solicitation

    Due February 22, 2024 at 2:00 PM EST. SAM.gov, notice 11b2505d7d824d9b97942fc975ecc239

  3. February 20, 2024

    Solicitation

    Due February 22, 2024 at 2:00 PM EST. SAM.gov, notice 915a386a54a94f848408be6cdd466cff

  4. February 22, 2024

    Solicitation

    Due March 7, 2024 at 2:00 PM EST. SAM.gov, notice 9beee906c5454fb79beb04e435ca34ec

  5. March 1, 2024

    Solicitation

    Due March 7, 2024 at 2:00 PM EST. SAM.gov, notice 7de60f06e5aa472e9a317ea14dc566a5

  6. June 28, 2024

    Solicitation

    Due March 7, 2024 at 2:00 PM EST. SAM.gov, notice 616bca358b3343be8fff3f8d37d8f832

Points of contact