Combined synopsis and solicitation, total small business set-aside
Juniper Springs Boardwalk
12445226Q0008
Forest Service, Usda-Fs, Csa East 12. Other Heavy and Civil Engineering Construction.
Response deadline
August 17, 2026 at 2:00 PM EDT
Closed 75 days ago. Posted August 13, 2026, first published June 9, 2026. Scheduled to archive September 30, 2026.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2026
132 like it are open now in other heavy and civil engineering construction
- P110 CAPE CANAVERAL RAILHEAD AND TRANSFER FACILITIES AT KENNEDY SPACE CENTER, FLORIDA
Department of the Navy, Navfacsyscom Southeast
PresolicitationNAICS 237990Merritt Island, FLN6945027R0006Closes in 4 daysNov 4 - Timucuan Ecological and Historic Preserve TIMU-335
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237990Florida140P2026R0081Closes in 13 daysNov 13 - KC-46A ADAL Apron and Hydrant Fueling Pits
Department of the Army, W074 Endist Mobile
SolicitationNAICS 237990FloridaW9127825RA068Closes in 18 daysNov 18
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
August 13, 2026
The SF 1442 has been revised to include the "address offer to" information.
____________________________________________________________________________
August 10, 2026
Amendment 2 is now posted in theAttachments/Links section of this posting. The purpose of this amendment is to:
1. Include clauses in the solicitation that were inadvertently not included. The revised solicitation is posted in the Attachments/Links section.
2. Provide further clarification that the General Contractor licensure/registration in the State of Florida requirement is for the Prime Contractor. The Prime cannot utilize the the subcontractor's licensure/registration to fulfill this requirement.
The quote due date is not extended due to this Amendment.
_______________________________________________________________________________________
July 24,2026
Amendment 1 is now posted in the Attachments/Links section of this posting. The purpose of this amendment is to:
- Provide answers to questions from Industry that were submitted by the July 2, 2026 deadline.
- Upload the following the Geotechnical Engineering Report and Statement of Work.
- Extend the quote submittal date from August 10, 2026 to August August 17, 2026 at 2:00 PM ET.
Disclosure of Magnitude of Construction Projects:
☐ Less than $25,000.
☐ Between $25,000 and $100,000.
☐ Between $100,000 and $250,000.
☐ Between $250,000 and $500,000.
☐ Between $500,000 and $1,000,000.
☐ Between $1,000,000 and $5,000,000.
☒ Between $5,000,000 and $10,000,000.
☐ More than $10,000,000.
June 18, 2026
Offerors are highly encouraged to attend the site visit on June 24, 2026 at 9:00 AM. See Attachment
7- Site Visit Information- JSB for further details. Please submit your RSVP via email to Jalisa.sims@usda.gov.
_________________________________________________________________________________________________________
June 9, 2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 12445226Q0008 is issued as a Request for Quotation (RFQ) for to remove one (1) existing boardwalk system and construct one (1) new boardwalk system within the Ocala National Forest. The new boardwalk system will utilize a modular system with post-on-pin foundations. Specialty structures such as overlooks, the kayak launch, and the Pedestrian Truss Bridge are also included in the project.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990. The small business size standard is $45 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- C04 Attachment 9- Past Performance Questionnaire.pdf165 KB, June 9, 2026
- C05_Attachment 11- Statement of Work - Juniper Springs Boardwalk Construction.pdf433 KB, July 24, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 9, 2026
Combined synopsis and solicitation
Due August 10, 2026 at 2:00 PM EDT. SAM.gov, notice 1f7e72b634f849efbec29be1d4e8bd9b
6 revisions on SAM
- August 13, 2026: publish, combined synopsis and solicitation
- August 10, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- June 18, 2026: publish, combined synopsis and solicitation
- June 9, 2026: publish, combined synopsis and solicitation
June 18, 2026
Combined synopsis and solicitation
Due August 10, 2026 at 2:00 PM EDT. SAM.gov, notice 12b32e24083c4fd7969e4d9bd8850a79
6 revisions on SAM
- August 13, 2026: publish, combined synopsis and solicitation
- August 10, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- June 18, 2026: publish, combined synopsis and solicitation
- June 9, 2026: publish, combined synopsis and solicitation
July 24, 2026
Combined synopsis and solicitation
Due August 17, 2026 at 2:00 PM EDT. SAM.gov, notice 1542196802984897ac146b7ca7b514ce
6 revisions on SAM
- August 13, 2026: publish, combined synopsis and solicitation
- August 10, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- June 18, 2026: publish, combined synopsis and solicitation
- June 9, 2026: publish, combined synopsis and solicitation
July 24, 2026
Combined synopsis and solicitation
Due August 17, 2026 at 2:00 PM EDT. SAM.gov, notice 786f9991989e4f7f8744560a7539a868
6 revisions on SAM
- August 13, 2026: publish, combined synopsis and solicitation
- August 10, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- June 18, 2026: publish, combined synopsis and solicitation
- June 9, 2026: publish, combined synopsis and solicitation
August 10, 2026
Combined synopsis and solicitation
Due August 17, 2026 at 2:00 PM EDT. SAM.gov, notice b20503b215614c7f97dee1b3c1703008
6 revisions on SAM
- August 13, 2026: publish, combined synopsis and solicitation
- August 10, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- June 18, 2026: publish, combined synopsis and solicitation
- June 9, 2026: publish, combined synopsis and solicitation
August 13, 2026
Combined synopsis and solicitation
Due August 17, 2026 at 2:00 PM EDT. SAM.gov, notice 95dc60b036eb4d67b1c31c9f35614470
6 revisions on SAM
- August 13, 2026: publish, combined synopsis and solicitation
- August 10, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- July 24, 2026: publish, combined synopsis and solicitation
- June 18, 2026: publish, combined synopsis and solicitation
- June 9, 2026: publish, combined synopsis and solicitation
Points of contact
- SIMS, JALISA Cjalisa.sims@usda.gov