12445126C0018 NFSR 205 Pavement Reconstruction LOUISIANA

12445126B0011

Forest Service, Usda-Fs, Csa East 11. Highway, Street, and Bridge Construction.

Awarded

R. C. Paving, Inc.

$2,612,639.89 obligated so far on USAspending

Description

As published on SAM.gov with the combined synopsis and solicitation of April 22, 2026.

Amendment 003 Site Visit Details for 03/25/2026, 0930CT, 799H+RJ, Alexandria, LA 71409, POC Robert Wilson robert.wilson3@usda.gov / 318-452-1442; RSVP Requested!

Amendment 002 Questions and Answers - Specifications Clarification Amendment 001 Updated to Pay Items /Reposting of Legible Plans Project Title:

NFSR 205 Pavement Reconstruction LOUISIANA Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5.

NAICS Code: 237310 - Highway, Street, and Bridge Construction (size standard $45m).

PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways.

Magnitude: Between $2,000,000 and $3,000,000.

Location: Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition.

Award of Task Order: A single award will be made to the overall lowest priced responsive/responsible bidder.

Tentative Dates: Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson robert.wilson3@usda.gov Date for Questions: 04/20/2026.

Bid Submittal Deadline: 04/30/2026, 1300 CT. - NOTE: Bid Bond is required Delivery: 120 Days After Notice to Proceed Period of Performance:

120 Days After Notice to Proceed Submittal Method: All proposals will be emailed to adam.doyle@usda.gov and cc steven.alves@usda.gov You may email to confirm receipt.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
KP7EZKW88KG9
CAGE
3BWK8
Vendor location
Deridder, LA
Contract
12445126C0018, definitive contract
Obligated
$2,612,639.89
Actions
2 between May 6, 2026 and August 27, 2026
Competition
Full and Open Competition After Exclusion of Sources, 19 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
FY26-003509 Approved 03162026 FAR 52.222-90, Addressing Dei Discrimination by Federal Contractors (Apr 2026) Disaster Hurricane Laura Relief Roadway Rehabilitation of NFSR 205
Match
award number 12445126C0018 equals the contract number; same awarding office 124451 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 25, 2026

    Combined synopsis and solicitation

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA

    Due April 30, 2026 at 2:00 PM EDT. SAM.gov, notice 2b14443381b44f2f8b47d787a59a26e3

  2. March 4, 2026

    Combined synopsis and solicitation

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA

    Due April 30, 2026 at 2:00 PM EDT. SAM.gov, notice 6313b7f06adf491dabd7356c1d39f7c1

  3. March 4, 2026

    Combined synopsis and solicitation

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA

    Due April 30, 2026 at 2:00 PM EDT. SAM.gov, notice 9bf19cb202544f40874897f7936bc074

  4. March 9, 2026

    Combined synopsis and solicitation

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA

    Due April 30, 2026 at 2:00 PM EDT. SAM.gov, notice 86252b3c38e24bd29354208b71b6a5f0

  5. March 19, 2026

    Combined synopsis and solicitation

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA

    Due April 30, 2026 at 2:00 PM EDT. SAM.gov, notice bac9f2fc9da448e1a1f98ce0c687b98c

  6. April 10, 2026

    Combined synopsis and solicitation

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA

    Due April 30, 2026 at 2:00 PM EDT. SAM.gov, notice cda891693369416f9eddefc064aac4d1

  7. April 22, 2026

    Combined synopsis and solicitation

    12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA

    Due April 30, 2026 at 2:00 PM EDT. SAM.gov, notice 01a322e8b8cb43d6bf5ce20524835a3f

  8. May 7, 2026

    Award notice, originally combined synopsis and solicitation

    Awarded to R. C. PAVING, Inc. Deridder for $2,612,640. SAM.gov, notice 5f71db5636b9411a8d8683ccde1b8f0a