Skip to content
Abierto

Solicitation, total small business set-aside, first published as presolicitation

CUSTER GALLATIN NATIONAL FOREST - West Fork Beaver Creek Trail #222 Flood Repair

1240LU24R0016

Forest Service, Custer Gallatin National Forest. Other Heavy and Civil Engineering Construction.

Response deadline

July 11, 2024 at 6:00 PM EDT

Closed 798 days ago. Posted June 18, 2024, first published May 20, 2024. Scheduled to archive July 26, 2024.

Description

As published on SAM.gov.

PROJECT DESCRIPTION: Hand construct approximately 560 feet of new 72” wide, full bench stock trail through two washed out avalanche ravines, within a non-motorized wilderness designation. Work includes new trail construction with picks, rock bars, jack hammers, drilling and blasting. New construction is within extremely steep slopes, loose soils, extensive rock, eroding rock cliffs, outcroppings, and bedrock.

Repeated, extensive surface and subsurface drilling and blasting will likely be necessary along numerous sections within these ravines to establish a 72” full bench trail, and remove excess material from the backslope and hillside above the trail. A full bench trail cut down to a solid subsurface material will be crucial to trail longevity. Backslope will be reduced to a 4:3 ratio in mixed material, and a 5:2 within rock. Material to be excavated is estimated at 962 cubic yards.

Hand construct a 48” wide bench approximately 20’ above the new trail location, near the top of the trail’s planned cut slope. This bench will serve to catch falling rock and debris from above during trail excavation, as well as provide a safe platform to begin excavation below, and an anchor point for rope work. Backslope will be reduced to a 5:2 ratio above this bench. Material to be excavated is estimated at 268 cubic yards.

Restore approximately 13,366 lineal feet of existing trail to the desired specification of a 36” width trail prism with a 24” finished tread. Backslope will be reduced to a 3:2 ratio. Restoration includes reconstructing and cleaning existing drain dips and water bars.

PROJECT LOCATION: The project is located within a non-motorized wilderness designation within the Madison Mountain range approximately 22 miles northwest of West Yellowstone, MT. From West Yellowstone, follow north on highway 191 approximately 8 miles. Turn left or west on highway 287, and follow for approximately 14 miles to the Beaver Creek road, between Hebgen and Earthquake lakes. Turn right or north on Beaver Creek road #985, and follow for three miles to the West Fork Beaver Creek trailhead and beginning of project. MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $250,000 and $500,000.

BONDING: All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee. There is no formal site visit for this project. Vendors are strongly encouraged to visit the site prior to submitting their proposal. For site information, clarification on directions and site conditions (such as closures, snow levels, etc.) please contact Todd Orr, Engineer Tech, Custer Gallatin National Forest at 406-587-6741 (todd.orr@usda.gov) during normal business hours. Question & Answers #1 - Posted 6/18/2024

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 20, 2024

    Presolicitation

    Due July 10, 2024 at 6:00 PM EDT. SAM.gov, notice 99c8cec9ade04ac4af9b175004f1941c

  2. June 11, 2024

    Solicitation, originally presolicitation

    Due July 11, 2024 at 6:00 PM EDT. SAM.gov, notice 61b25aad105f4fae83fde9fc7aadb549

  3. June 18, 2024

    Solicitation

    Due July 11, 2024 at 6:00 PM EDT. SAM.gov, notice 1698be12cc894751a05501f6144871e3

Points of contact