Combined synopsis and solicitation, total small business set-aside
New Meadows Range Barn
1240LT27Q0027
Forest Service, Payette National Forest. Water and Sewer Line and Related Structures Construction.
Offers due
November 28, 2026 at 7:00 PM EST
29 days from now. Posted October 29, 2026, first published October 28, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Similar, open now
- YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237110Location not published140PP027R0009Closes in 2 daysNov 2 - Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Department of the Army, W072 Endist Louisville
Sources soughtNAICS 237110Lockwood, CAW912QR-PDB-FHLWATERCloses in 3 daysNov 3 - GRCA 318719 North Rim & Roaring Springs Rehabilitation Program
Departmental Offices, National Park Service Contracting Activity
PresolicitationNAICS 237110Location not published140PP027R0005Closes in 6 daysNov 6
All 24 open in water and sewer line and related structures construction
Description
As published on SAM.gov.
A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654.
B. Base work includes the following described below:
1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing.
2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces.
3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces.
4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required.
C. Optional work includes the following described below:
1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers.
D. Quantities associated with these options are identified in the Schedule of Items
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- C04f WD Adams County Idaho 1240LT27Q0027.pdf63 KB, October 28, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 28, 2026
Combined synopsis and solicitation
Due November 28, 2026 at 7:00 PM EST. SAM.gov, notice d220126158854b719cbc6be76079241e
2 revisions on SAM
- October 29, 2026: publish, combined synopsis and solicitation
- October 28, 2026: publish, combined synopsis and solicitation
October 29, 2026
Combined synopsis and solicitation
Due November 28, 2026 at 7:00 PM EST. SAM.gov, notice b08fa8ab3a6d41a3b8a58fc869b015d8
2 revisions on SAM
- October 29, 2026: publish, combined synopsis and solicitation
- October 28, 2026: publish, combined synopsis and solicitation
Points of contact
- Derrick A Dodsonderrick.dodson@usda.gov