Combined synopsis and solicitation, total small business set-aside
Champion Creek Pit Rock Crushing Supply
1240LT27Q0008
Forest Service, White River National Forest. Construction Sand and Gravel Mining.
Offers due
November 5, 2026 at 7:00 PM EST
13 days from now. Posted October 16, 2026, first published October 16, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Similar, open now
- Road Rock and Ditch Lining
Department of the Army, W6QM Micc-Ft Drum
Combined synopsis and solicitationSmall businessNAICS 212321Anywhere in the USW911S227U0065Closes in 3 daysOct 27 - Aggregate Stone Material - Fort Riley, Kansas
Department of the Army, W6QM Micc-Ft Riley
Combined synopsis and solicitationSmall businessNAICS 212321Anywhere in the USFort RileyW911RX27QA002Closes in 15 daysNov 8
Description
As published on SAM.gov.
Champion Creek Pit Rock Crushing
Description:
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Choose an item. are being requested and a separate written solicitation will not be issued.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 212321 - Construction Sand and Gravel Mining. The small business standard is No more than 500 employees. This acquisition is Firm Fixed Price. All responsible sources may submit a quotation which will be considered by the agency.
General Information:
1.0 Scope of Work
This project will develop the Champion Creek Pit for crushed aggregate surfacing material for use on forest roads. This work
includes all required clearing, grubbing, topsoil stripping, overburden removal, material processing/crushing, material
stockpiling, and restoration activities when finished. The Champion Creek Pit is located on the Sawtooth National Recreation
Area of the Sawtooth National Forest.
Project Location:
From the Sawtooth NRA Ranger Station, travel south along State Highway 75 for approximately 13.5 miles. Turn left on
Forest Road 70458, veer left, and continue about
IAW: Solicitation and all applicable specifications, attachments and any amendments
to include but not limited to;
A04_Section C Champion Pit Crushing
A04a_Schedule Of Items Section Champion Pit Crushing
A04b_FP14 Supplemental Specs Champion Pit Crushing
A04c_Design Drawings Champion Pit Crushing
A06_Fire Precautions Plan
Award Schedule:
Posting: 10/16/2026
Site Visit: 10/28/2026 @ 1300 MST
Q&A Due Date: 10/30/2026
Quotes Due Date: 11/05/2026
Anticipated Award Date: 11/16/2026
POP: 05/03/2027 – 06/30/2027 = 58 days
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- C06_FirePrecautions Plan_1240LT27Q0008.pdf117 KB, October 16, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 16, 2026
Combined synopsis and solicitation
Due November 5, 2026 at 7:00 PM EST. SAM.gov, notice 216c5bfdd1844d2db41094819576f05c
2 revisions on SAM
- October 16, 2026: publish, combined synopsis and solicitation
- October 16, 2026: publish, combined synopsis and solicitation
October 16, 2026
Combined synopsis and solicitation
Due November 5, 2026 at 7:00 PM EST. SAM.gov, notice 62facea8bef346c9833de1663487df50
2 revisions on SAM
- October 16, 2026: publish, combined synopsis and solicitation
- October 16, 2026: publish, combined synopsis and solicitation
Points of contact
- Lonnie D Root, Contracting Officerlonnie.root@usda.gov
- Braidy Richinsbraidy.richins@usda.gov