Combined synopsis and solicitation, total small business set-aside
REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS
1240LT26Q0182
Forest Service, Usda-Fs, Csa Intermountain 8. Structural Steel and Precast Concrete Contractors.
Response deadline
September 23, 2026 at 5:00 PM EDT
Closed 38 days ago. Posted September 9, 2026. Scheduled to archive October 8, 2026.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed 38 days ago
1 like it is open now in structural steel and precast concrete contractors
- Request for Information for On-Site Fabrication and Assembly of a Three-Bay High-Performance Magazine (HPM) Structure
Department of the Army, W2R2 USA Engr R & D CTR
Sources soughtNAICS 238120LouisianaW912HZ27X1CTBCloses in 4 daysNov 4
Description
As published on SAM.gov.
The Contractor shall provide all professional services necessary for the accomplishment of each project and such required services shall be in accordance with requirements as described herein.
-
- The Contractor shall provide services for the following tasks marked by an “X”:
[X] Provide a quote and a technical proposal to complete the project as per project requirements. Provide separate estimates for Base and both options.
[X] The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete and pour new concrete drainage that is approximately 6ft x 48ft x 6” inches in depth for building #11. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete. Minimum ½” rebar must be used as to proper code for slabs and any materials necessary. The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the drainage to run off towards the north elevation. Contractor to cut in grooves that are to the satisfaction of the COR onsite.
[X] Option 1: Bldg#28 south side: Demo old Concrete pad approximately 25ft. wide by 30ft. in length by 6 inches in depth with all associated landscaping, fill, re-bar and materials and install new concrete pad. Cut groves into the concrete on slopes like currently exists. Reinstall drainpipe and work around pea rock roof
[X] Option 2: Bldg#12 east side: The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete sections and pour new concrete ramp that is approximately 28ft. x 90ft x 6” inches in depth. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete. Minimum ½” rebar must be used as to proper code for slabs and any materials necessary. The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the upper ramp elevation area and cut in heavy grooves as presently exist that are to the satisfaction of the COR onsite. Existing railings shall be removed and a new one installed and cemented in with the concrete.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- C04 WD Morton County ND 1240LT26Q0182.pdf63 KB, September 9, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 9, 2026
Combined synopsis and solicitation
Due September 23, 2026 at 5:00 PM EDT. SAM.gov, notice 82350e0c61ac4dafb46b590df3677e29
1 revisions on SAM
- September 9, 2026: publish, combined synopsis and solicitation
Points of contact
- Derrick A Dodsonderrick.dodson@usda.gov