Combined synopsis and solicitation, total small business set-aside
REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS
1240LT26Q0182
Forest Service, Usda-Fs, Csa Intermountain 8. Structural Steel and Precast Concrete Contractors.
Offers due
September 23, 2026 at 5:00 PM EDT
7 days from now. Posted September 9, 2026.
Description
As published on SAM.gov.
The Contractor shall provide all professional services necessary for the accomplishment of each project and such required services shall be in accordance with requirements as described herein. The Contractor shall provide services for the following tasks marked by an “X”: [X] Provide a quote and a technical proposal to complete the project as per project requirements. Provide separate estimates for Base and both options.
[X] The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete and pour new concrete drainage that is approximately 6ft x 48ft x 6” inches in depth for building #11. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete. Minimum ½” rebar must be used as to proper code for slabs and any materials necessary.
The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the drainage to run off towards the north elevation. Contractor to cut in grooves that are to the satisfaction of the COR onsite. [X]
Option 1: Bldg#28 south side: Demo old Concrete pad approximately 25ft. wide by 30ft. in length by 6 inches in depth with all associated landscaping, fill, re-bar and materials and install new concrete pad. Cut groves into the concrete on slopes like currently exists. Reinstall drainpipe and work around pea rock roof [X]
Option 2: Bldg#12 east side: The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete sections and pour new concrete ramp that is approximately 28ft. x 90ft x 6” inches in depth. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete. Minimum ½” rebar must be used as to proper code for slabs and any materials necessary.
The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the upper ramp elevation area and cut in heavy grooves as presently exist that are to the satisfaction of the COR onsite. Existing railings shall be removed and a new one installed and cemented in with the concrete.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 9, 2026
Combined synopsis and solicitation
Due September 23, 2026 at 5:00 PM EDT. SAM.gov, notice 82350e0c61ac4dafb46b590df3677e29
Points of contact
- Derrick A Dodsonderrick.dodson@usda.gov
Also open from this buyer
- Forest Wide Well Decommissioning Mystic River and Custer Ranger Districts, Black Hills National Forest, South DakotaCombined synopsis and solicitationSmall businessNAICS 237110South Dakota1240LT26Q0168Closes todaySep 16
- Wapiti Ranger District Warehouse Roof ReplacementCombined synopsis and solicitationSmall businessNAICS 238160Wyoming1240LT26Q0165Closes tomorrowSep 17
- Gunnison Ranger District Soap Creek Stream RepairsCombined synopsis and solicitationSmall businessNAICS 237990Colorado1240LT26Q0171Closes tomorrowSep 17
- GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National ForestCombined synopsis and solicitationSmall businessNAICS 237110Arizona1240LT26Q0094Closes in 2 daysSep 18
- GAOA Sherando Recreation Area Rehabilitation, George Washington-Jefferson National ForestCombined synopsis and solicitationSmall businessNAICS 237110Virginia1240LT26Q0089Closes in 2 daysSep 18