Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

Upper Baker Installing Trailer Pads and Utilities

1240LT26Q0126

Forest Service, Manti-Lasal National Forest. Water and Sewer Line and Related Structures Construction.

Response deadline

August 10, 2026 at 7:00 PM EDT

Closed 83 days ago. Posted July 7, 2026. Scheduled to archive August 25, 2026.

Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities

This one closed in 2026

25 like it are open now in water and sewer line and related structures construction

All 25 open in water and sewer line and related structures construction

Description

As published on SAM.gov.

This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code.

Utilities –

Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection.

Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code.

Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.

Option Items –

Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements.

                      Crushed Aggregate – Grade G Road Base for the trailer pads and roadway

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 7, 2026

    Combined synopsis and solicitation

    Due August 10, 2026 at 7:00 PM EDT. SAM.gov, notice 951967d44bd44757925a825597357cf3

    1 revisions on SAM
    • July 7, 2026: publish, combined synopsis and solicitation

Points of contact