Combined synopsis and solicitation, total small business set-aside
GAOA 4FO SMCG Trail Renovation
1240LT26Q0027
Forest Service, Humboldt-Toiyabe National Forest. All Other Specialty Trade Contractors.
Response deadline
March 31, 2026 at 7:00 PM EDT
Closed 215 days ago. Posted February 25, 2026. Scheduled to archive April 15, 2026.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2026
15 like it are open now in all other specialty trade contractors
- Sources Sought Installation Services of a Cable Rail Fence System
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 238990Anywhere in the US36C26127Q0132Closes in 3 daysNov 4 - Crane Services
Department of the Navy, NAVSUP FLC Jacksonville Erp
Sources soughtNAICS 238990Panama City Beach, FLN6883627Q0008Closes in 3 daysNov 4 - FTC Oklahoma City- Replace Jet Bridge
Federal Prison System / Bureau of Prisons, Fao
Sources soughtNAICS 238990Oklahoma City, OK15B51326PR000174Closes in 3 daysNov 4
Description
As published on SAM.gov.
- This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36” cmp.
- Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite.
- Aggregate base shall be 4” depth below asphalt. Asphalt trail shall have 6’ width, 3” depth and 2% cross slope (max).
- Aggregate base, asphalt and concrete testing per FP-24.
- Resting pads shall be asphalt with 4’ width, 6’ length, 3” depth and 2% cross slope (max) in all directions. Resting pads aggregate base shall be compacted with water.
- Concrete curb shall be NDOT Type 5. Spillway to culvert inlet is inclusive to curb. Concrete curb may be placed on compacted aggregate base. Native subbase shall be compacted with water. The grade will be inspected for soft spots and accepted before concrete placement. Backfill to top of curb with native material.
- Corrugated metal pipe item includes submitting a proposed pipe plot for placement of 36” culvert. Design for minimum 5% drop. Removal of existing culvert, inlet stacked rock and outlet riprap are inclusive to new culvert placement.
- All work to extend asphalt trail and shoulders is inclusive to the option items
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Wage Determination Clark County Nevada NV20260024.pdf53 KB, February 25, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 25, 2026
Combined synopsis and solicitation
Due March 31, 2026 at 7:00 PM EDT. SAM.gov, notice 1212ca9c2d924ccda86e49d3dfada66a
1 revisions on SAM
- February 25, 2026: publish, combined synopsis and solicitation
Points of contact
- Derrick Dodsonderrick.dodson@usda.gov
- Coby Cubiccoby.cubic@usda.gov