Skip to content
  • 6,807 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

GAOA 4FO SMCG Trail Renovation

1240LT26Q0027

Forest Service, Humboldt-Toiyabe National Forest. All Other Specialty Trade Contractors.

Response deadline

March 31, 2026 at 7:00 PM EDT

Closed 215 days ago. Posted February 25, 2026. Scheduled to archive April 15, 2026.

Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities

This one closed in 2026

15 like it are open now in all other specialty trade contractors

All 15 open in all other specialty trade contractors

Description

As published on SAM.gov.

  1. This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36” cmp.
  2. Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite.
  3. Aggregate base shall be 4” depth below asphalt. Asphalt trail shall have 6’ width, 3” depth and 2% cross slope (max).
  4. Aggregate base, asphalt and concrete testing per FP-24.
  5. Resting pads shall be asphalt with 4’ width, 6’ length, 3” depth and 2% cross slope (max) in all directions. Resting pads aggregate base shall be compacted with water.
  6. Concrete curb shall be NDOT Type 5. Spillway to culvert inlet is inclusive to curb. Concrete curb may be placed on compacted aggregate base. Native subbase shall be compacted with water. The grade will be inspected for soft spots and accepted before concrete placement. Backfill to top of curb with native material.
  7.  Corrugated metal pipe item includes submitting a proposed pipe plot for placement of 36” culvert. Design for minimum 5% drop. Removal of existing culvert, inlet stacked rock and outlet riprap are inclusive to new culvert placement.
  8. All work to extend asphalt trail and shoulders is inclusive to the option items

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 25, 2026

    Combined synopsis and solicitation

    Due March 31, 2026 at 7:00 PM EDT. SAM.gov, notice 1212ca9c2d924ccda86e49d3dfada66a

    1 revisions on SAM
    • February 25, 2026: publish, combined synopsis and solicitation

Points of contact