Skip to content
Abierto

Solicitation, total small business set-aside

SOUTH PARK DISTRICT OFFICE REHAB

1240LT25R0039

Forest Service, USDA Forest Service-Spoc Im. Commercial and Institutional Building Construction.

Response deadline

August 29, 2025 at 11:00 AM EDT

Closed 384 days ago. Posted August 14, 2025, first published July 29, 2025. Scheduled to archive September 15, 2025.

Description

As published on SAM.gov.

SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS 08/14/2025:

Amendment 00002 (A0002): See and read the following in association with Amendment 0002:

Amendment 0002 (A0002) - read in its entirety as it includes the Summary of Changes with answers to contractor's questions and revsions to supporting solicitation documents. Also included in this Amendment as an attachment is Updated Attach _3 Specifications_08.14.2025. A0002 and the Updated Attachment are located in the Attachments/Links.

07/31/2025:

Amendment 0001 (A0001): See and read the following in association with Amendment 0001:

Amendment 0001 (A0001) and the Updated Attachments 3 and 4 for updates to the Specifications and Drawings. The Updated Attachments along with A0001 are located in the Attachments/Links. The project scope of work includes, but is not limited to, the following:

Mobilization, quality control, removal and installation of a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom.

Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details. Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions.

See the SOW, SOI, Specifications, and Drawings for more details. An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 29, 2025

    Solicitation, originally presolicitation

    Due August 25, 2025 at 11:00 AM EDT. SAM.gov, notice e317eaca4bc648ffb1fe491014038ecd

  2. July 31, 2025

    Solicitation

    Due August 29, 2025 at 11:00 AM EDT. SAM.gov, notice 114bed5401f447419b124c500dc68aea

  3. August 14, 2025

    Solicitation

    Due August 29, 2025 at 11:00 AM EDT. SAM.gov, notice ce635a6dd09a48aea146eb994e12e52f

Points of contact