Skip to content
Abierto

Solicitation, total small business set-aside

Culvert Replacement Meadow Creek

1240LT25Q0054

Forest Service, Usda-Fs, Csa Intermountain 8. Highway, Street, and Bridge Construction.

Response deadline

October 30, 2025 at 3:00 PM EDT

Closed 322 days ago. Posted October 2, 2025, first published September 23, 2025. Scheduled to archive November 14, 2025.

Description

As published on SAM.gov.

10-2-2025 - UPDATE - Site Visit is hereby CANCELED A new date will be esatblished once the Government Shutdown concludes. The culvert at Meadow Creek has failed and is need of replacement. This is in a live stream (meadow creek) and the water is creating a void under the road as it erodes causing the road to settle and create a hazardous situation. The 72” diameter pipe is located on the West Dolores Road (NFSR 535) at milepost 24.72 just past burro bridge.

The objective is to replace the pipe with a steel polycoated culvert that will resist rusting from the mineral content in the stream. A bypass road will be constructed to allow continued traffic throughout the duration of the project which is anticipated to last two weeks. Rip-rap will be collected on-site and commercially purchased ¾”-minus road base will be used for surfacing. See attached SOW, Specs, and Drawings for full project Requirements

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 23, 2025

    Solicitation

    Due October 20, 2025 at 3:00 PM EDT. SAM.gov, notice 7c1f36063b244bd9b74e81d70481a5a7

  2. October 2, 2025

    Solicitation

    Due October 30, 2025 at 3:00 PM EDT. SAM.gov, notice e87ca81b7c364b51a87465d1fb62eacf

Points of contact