Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, total small business set-aside, first published as presolicitation

South Schells Fence Restoration

1240LT25B0003

Forest Service, Humboldt-Toiyabe National Forest. All Other Specialty Trade Contractors.

Response deadline

February 14, 2025 at 12:00 PM EST

Closed 625 days ago. Posted January 29, 2025, first published December 4, 2024. Scheduled to archive March 1, 2025.

Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities

This one closed in 2025

15 like it are open now in all other specialty trade contractors

All 15 open in all other specialty trade contractors

Description

As published on SAM.gov.

The intent of this project is to remove and replace approximately 9.6 miles of existing barbwire fence line, and install approximately 1.98 miles of new fenceline within the Duck Creek Basin on the Ely Ranger District. This project includes the removal of approximately 50,686 feet of existing barbwire fence as a lump sum. Approximately 61,153 feet of new barbwire fence are to be installed including an estimated eleven 12-foot wire gates.

All brace and anchor posts are to be schedule-40, galvanized steel except for wood posts located at the wire gates. Clearing of vegetation is allowed as needed to ensure a straight fence, however heavy equipment will not be allowed to clear the fencelines. Chainsaws are allowed for vegetation clearing. Fence runs should not deviate more than 12-inches from a straight line between braces.

The Schedule A work includes removing and replacing barbwire fences in locations A and C, and adding a new barbwire fence to location D. The Option A work includes removing and replacing barbwire fence in location B. Work shall be performed in accordance with specifications and drawings in the plan sheets, followed by the ‘Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14).’

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. December 4, 2024

    Presolicitation

    Due February 14, 2025 at 12:00 PM EST. SAM.gov, notice 61b6aef7068b4c759d2b4e3937d49259

  2. December 4, 2024

    Presolicitation

    Due February 14, 2025 at 12:00 PM EST. SAM.gov, notice d3b8ea6dbf4a4eea95f34717c3035610

  3. December 20, 2024

    Solicitation

    Due February 14, 2025 at 12:00 PM EST. SAM.gov, notice c5a70fc11f8c4e048a292722f272371a

  4. January 29, 2025

    Solicitation

    Due February 14, 2025 at 12:00 PM EST. SAM.gov, notice 76059889226145cb8c5e3ab1516f126b

Points of contact